My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/02/2011 - Special Jt Mtg w CC
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2011
>
Agenda - Planning Commission - 06/02/2011 - Special Jt Mtg w CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:08:24 AM
Creation date
5/31/2011 8:33:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special Jt Mtg w CC
Document Date
06/02/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Parking lot landscaping. All parking lots are required to provide internal overstory tree <br />plantings in an effort to shade parking surfaces and provide visual relief. Plantings are required <br />at the following minimum schedule. The planting schedule is established to provide an <br />acceptable number of plantings that may be planted in regular symmetrical patterns or <br />irregular clusters or groupings. <br />1. One tree per every ten parking spaces. <br />2. Every overstory tree planting shall be provided with a planting area of 162 square <br />feet. <br />3. Acceptable ground cover materials include sod, mulch, and other natural ground <br />cover. Landscaping rock and plastic underlayment is not allowed. <br />4. All parking lot planting areas shall include underground irrigation systems. <br />f. Bufferyards. Bufferyards are intended to provide additional screening of businesses that <br />are adjacent to residential areas. The following table details the width of the bufferyard along <br />the common adjacent property line. An additional increase of landscape plantings would be <br />required in the bufferyard. That increase is expressed in the table below as a percentage of the <br />total required site landscaping in the setback area. <br />Pr E-1 <br />op Bufferyard <br />os width <br />ed <br />De <br />vel % increase in <br />op plantings <br />m required <br />en 30% <br />t <br />Existing Ad(acent Development <br />F R-2 R-3 B-1 <br />1 <br />60 ft. 60 ft. 60 ft. <br />B-2 <br />35 ft. 35 ft. <br />30% 30% 20% 20% <br />(4) Off-street loading. All off-street loading dock/berth areas shall be a minimum of 50 feet in <br />length and there shall be at least one dock/berth for the first 10,000 square feet of floor area and one <br />additional berth/dock for each additional 25,000 square feet of floor area. <br />(f) Architectural standards. All exterior wall finishes on any building shall be: <br />(1) Face brick; <br />(2) Stucco; <br />(3) Glass; <br />
The URL can be used to link to this page
Your browser does not support the video tag.