Laserfiche WebLink
TRAIL DEVELOPMENT FEE <br />$600 per dwelling unit <br />SEWER AND WATER TRUNK AND LATERAL FEES <br />Water Connection/Trunk - $2,308 /unit <br />Water Lateral - actual cost or if it is already there, $9,102 /unit <br />Sewer Connection/Trunk - $1,318 /unit <br />Sewer Lateral - actual cost or if it is already there, $3,989 /unit <br />STORMWATER MANAGEMENT FEE <br />$465 per dwelling unit <br />STREET AND TRAFFIC CHARGES <br />Street or Traffic Signs $225 /sign <br />Future Sealcoating $1.45 /square yard <br />STREET LIGHTS <br />Cobra $ 1,300 /light <br />Traditionaire Subdivision $1,700 /light <br />The COR $2,600 /light <br />3 Year 0 & M $294 /light <br />FEES COLLECTED IN BUILDING PERMIT <br />Sewer Availability Charge (SAC)* - $2,230 /SAC Unit ** <br />Water Availability Charge (WAC) * - $1,701 /WAC Unit ** <br />SAC Handling Fee - $200/Residential Equivalent ** <br />ON -GOING UTILITY FEES <br />Sewer Utility $66.79 + 2.89/1,000 gallons in excess of 20,000 gallons <br />Water Utility $34.05 minimum ($2.27/1,000 gallons for 1 15,000 gallons; $236/1,000 for <br />15,001- 25,000; $2A4/1,000 for 25,001- 40,000; $2.58/1,000 for 40,001- 60,000; <br />$2.78/1,000 for 60,001- 99,000; $3.08/1,000 for 99,001- 201,000; $3.68/1,000 for <br />200,001 and above. <br />Stormwater Utility $9.27/quarter <br />Recycling $8.85 /quarter <br />Street Lights $9.01 /quarter (urban subdivision after 7/92) <br />$14.85 /quarter (rural subdivision) <br />$1.37 /quarter (priority -all residential lots) <br />* <br />** <br />Planned Unit Dev. 10% gross land area + $2,475 /unit <br />Metropolitan Council charge <br /># of units determined by Building Official <br />