My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/01/1999
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1999
>
Agenda - Planning Commission - 06/01/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:16:54 AM
Creation date
9/16/2003 9:59:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/01/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br />REQUEST FOR AN ENVIRONMENTAL PERMIT TO ALTER THE LANDSCAPE OF <br />PROPERTY LOCATED IN THE RUM RIVER SCENIC OVERLAY DISTRICT; <br /> CASE OF JIM AND KATHY WEIDENBACH <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />On May 11, 1999, the City received an application from Jim Weidenbach at 14230 Bowers Drive <br />N.W. to regrade and stabilize the bluff line along the Mississippi River on his property. The <br />following items are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br />d) <br />e) <br /> <br />g) <br />h) <br />i) <br /> <br />Site location map <br />Three (3) sheet set of project plans <br />Letter from DNR dated March 16, 1998 <br />Letter from DNR dated October 21, 1998 <br />DNR Permit and cover letter dated February 5, 1999 <br />Letter from DNR dated May 27, 1999 <br />Memo from Community Development Assistant dated May 28, 1999 <br />Proposed findings of fact :: <br />Proposed environmental permit <br /> <br />Notification: <br /> <br />Public hearing notices were sent to properties in excess of the 350 feet radius required by State <br />law. <br /> <br />Observations: <br /> <br />The subject property is located in the Mississippi River Critical Overlay District and is also <br />subject to the Wild and Scenic River regulations. After visits with City and DNR staff from <br />March to October, 1998, it was confmued that there are serious bluff erosion problems on the <br />property. It was the consensus of all jurisdictions that the proposed project to control soil erosion <br />was excessive. In September of 1998, Mr. Weidenbach submitted an application to DNR to <br />regrade and stabilize the river bluff on his property. On February 5, 1999, DNR issued a permit <br />to Mr. Weidenbach to p6rform the landscape alterations up to the ordinary high water mark, <br />noting that any work above the high water mark required a permit from the City. On April 14, <br />1999, the City received notification from DNR that the landscape alterations performed went <br />beyond the ordinary high water mark. Staff immediately notified Mr. Weidenbach to cease work <br />and implement some temporary erosion control measures until the proper permits are obtained. <br /> <br />Accordingly, Mr. Weidenbach applied for an environmental permit and submitted plans <br />identifying pre-existing and current slopes and the extent to which rip rap was installed. The <br />purpose of this after-the-fact permit is to ensure that the project is completed in accordance with <br />Critical River, Wild and Scenic River, and MNRRA guidelines. To do this, will at least require <br />restoration of the slope and top of bluff with native vegetation to mitigate the visual impact of <br />work performed and protect the natural and scenic value of the river. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.