My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 12/07/1999
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1999
>
Agenda - Planning Commission - 12/07/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:18:34 AM
Creation date
9/16/2003 10:38:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
12/07/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br /> <br /> REQUEST FOR AN INTERIM USE PERMIT FOR <br />A TEMPORARY OFFICE STRUCTURE; CASE OF AMCOR PRECAST <br />By: Planning Consultant Jon Scalzo <br /> <br />Background: <br /> <br />On November 28, 1995, the City issued an interim use permit to Amcor Precast at 6640 Industry <br />Avenue N.W. for the utilization of a 24' x 60' modular office structure until June 30, 1997 to <br />complete their assessment of space needs for preparing a site plan to develop the site as a <br />permanent location for the applicant. After determining that it was premature, because of lower <br />than projected sales volume, to commit to developing permanent office space on the property, the <br />applicant applied for and was granted a second interim use permit of 2 years for the use of the <br />temporary use structure. The following items are enclosed for your review: <br /> <br />a) Site location map <br />b) Site plan <br /> <br />Observations: <br /> <br />The applicants are requesting another interim use permit to utilize the modular office structure <br />for a 2 year period. Amcor is presently looking for design build contractors for a 24,000 square <br />foot manufacturing facility to be built in the year 2000 with new offices and a batch plant to be <br />constructed in 2001. <br /> <br />The City has previously granted permits for temporary structures in the commercial and <br />industrial areas. Waste Management's permit for a temporary office structure was issued to be in <br />effect as long as it took for their final vertical expansion (3 years with 4 six month extensions <br />available). Listul's permit was granted for a one year period while they developed plans to <br />expand or relocate in Ramsey; they have received a one year extension. The School's permit was <br />issued for a 2 year period to allow time to construct the addition to Ramsey Elementary. <br />Rehbein's permit for a modular dwelling at the Links was to provide living quarters for the <br />project superintendent during construction of the golf course. <br /> <br />Recommendation: <br /> <br />Staff r~commends to coritinue this application until time that the City is able to review and adopt <br />new text supporting the processing and applications of interim use permits. The text amendment <br />will require recommendation by the Planning Commission and action by the City Council. Staff <br />will be requesting a 60 day extension of the applicant's submission to allow for processing of the <br />text amendment. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.