Laserfiche WebLink
anticipated that a cross Walk will be installed across Peridot Street near the southwest <br />corner of the site, <br /> <br />Spaces tYr a playground and a tot lot have been provided on the east side of the building, <br />adjacent to the elementary portion of the school building. The playgound wilt be <br />approximately fifty percent impervious and fifty percent tur~:'ed while the tot lot will be a <br />combination of turf and pea rock. <br /> <br />The south side of the building is essentially the "back of the house" A dock and the trash <br />enclosure are located adjacent to the storage room of the school and are hidden from the <br />public street system. <br /> <br />PACT Charter School has indicated that approximately 65 stalls on the west side of the <br />school will be dedicated to those secondary students who drive themselves to school <br />everyday. Those students will purchase a parking pass from the school, and the school <br />wilt limit the number of parking passes. The balance of the west lot will be for school <br />staff and parents who perform volunteer services at the school. The secondary students <br />parking in the west parking lot will enter the school tlzrough the west doors. <br /> <br />Students' who will be going to outdoor gym classes will be using the ball fields located to <br />the west of the school across Peridot Street. They will cross Peridot Street at the entry <br />drive located at the southwest corner of the site. <br /> <br />For those students ~vho ride their bikes to school, bike racks will be provided at the <br />southwest and the nertheast entrance doors. <br /> <br />Large truck deliveries will enter-the site at the southwest curb cut, proceed east along the <br />south service drive past the service dock, and back up to the dock. Once the delivery is <br />complete, the trucks will proceed north along the east parking lot and exit the site at the <br />north curb cut. Garbage trucks will enter the site at the north cm'b cut, proceed south <br />along the east parking lot, proceed west along the south service drive past the service <br />dock, and back up to the dumpster area. Once complete, the garbage trucks will exit the <br />site via the southwest curb cut. <br /> <br />Si~na~e <br /> <br />Two monument signs are proposed for the site. One sign will be located about midpoint <br />along the east property line. This sign will help to direct those traveling along Ramsey <br />Boulevard to turn at East Ramsey Parkway. Traveling west along East Ramsey Parkway, <br />vehicles will turn south on Peridot Street. There they will see the second monument sign <br />located about midpoint along the west property line. This sign will indicate the entrance <br />to the schooi west parking lot. <br /> <br />Gradin~ Plan <br /> <br />The ~ading plan for the site matches into the proposed grades for the Ramsey Town <br />Center development surrounding the PACT School. Drainage patterns are established to <br /> <br />32 <br /> <br /> <br />