My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #03-39 - 08/26/2003
Ramsey
>
Public
>
Ordinances
>
2003
>
Ordinance - #03-39 - 08/26/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:59:20 AM
Creation date
9/16/2003 11:11:57 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#03-39
Document Date
08/26/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bo <br /> <br />ho <br /> <br />Trunk and Lateral Sanitary Sewer. Sanitary sewer mains and service <br />connections stubbed in to the property line shall be installed to serve all lots <br />in the Subdivision and other such properties served by the subdivision <br />sewer main, when the location of such plat is within an area of the City <br />which is either being assessed for sanitary sewer service or for which such <br />service has been authorized by the Council. <br /> <br />Trunk and Lateral Water Mains. Water mains and service connections <br />stubbed in to the property line shall be installed to serve all lots in the <br />Subdivision and other such properties served by the subdivision watermain <br />when the location of such plat is within an area of the City which is either <br />being assessed for water service or for which such service has been <br />authorized by the Council. <br /> <br />Storm Drainage. A system of drainage shall be provided that will <br />conform and implement the City's comprehensive stormwater plan. <br /> <br />Storm Water Maintenance. Upon successful establishment of permanent <br />erosion control facilities the Subdivider shall safe guard the storm sewer <br />system from excess siltation caused by construction until 90% buildout <br />within a subdivision, including the sodding, the Subdivider shall clean all <br />storm sewers and shall also remove silt from all ponding areas which <br />received runoff from the development as well as all temporary erosion <br />control devices (i.e. silt fence). <br /> <br />Streets. Streets shall be constructed which are graded and paved in <br />accordance with specifications provided by the City. <br /> <br />Curb and Gutter. Concrete curb and gutter shall be installed in those <br />subdivisions where sanitary sewer and water are required. <br /> <br />Street Traffic Control Signals. If deemed necessary by the City Engineer <br />and Council, the owner or subdivider shall install street traffic control <br />signals. The signalization shall be constructed in conjunction with the <br />street unless the Council grants a waiver to delay signalization. In the <br />event such waiver is granted, the owner or subdivider shall deposit with the <br />City a sum of money equivalent to the Engineer's estimated c <br />signalization. 9.50.50 <br /> <br />Lot Grading. All lots shall be graded in accordance with the final grading <br />plan. In addition, erosion control measures shall be followed to eliminate <br />erosion. Upon completion of the grading, topsoil shall be restored and <br />temporary vegetation established. <br /> <br />Trail Development. Trail improvements shall be installed as shown on the <br />final plat and/or master trail plan. All accessible bikeway/walkway <br /> <br />9.50 Subdivision Iiegulations <br /> <br /> I <br /> <br />9-38 <br /> <br />August 2003 Draft <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.