My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 03/24/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:33:55 PM
Creation date
9/16/2003 1:30:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street Projects (continued) <br /> <br />It is also intended that all of the land, most of which is wetland, south of the right-of-way be <br />purchased for eventual nature preserve. As was the ease in the 1991 improvement, the MSA <br />fund will provide for the entire cost of the roadway. It is suggested that, in addition to "the <br />roadway, an off-road trail be completed as an MSA eligible project expense. The major project <br />costs include land acquisition, construction costs, and project overhead. The total project cost is <br />estimated to be $836,000. <br /> <br />McKinley Street <br /> Commercial Asphalt/Jaspar <br /> <br />This project will complete McKinley Street as a collector street through the City's industrial area <br />from the eastern City limits to Rarnsey Boulevard. It will serve the industrial and commercial <br />property north of the railroad tracks and provide access frontage for the development of <br />properties to the north. The project would require the installation of approximately 3,000 feet of <br />roadway along with associated storm sewer. Sanitary sewer and watermain are either presently <br />in place or are anticipated to be in place prior to the construction of the roadway. The costs <br />associated with this improvement include right-of-way, construction costs and overhead. The <br />total project cost is estimated to be $830,000. <br /> <br />Sunwood Drive <br /> C.R. #56/C.R. #116 <br /> <br />This project proposed constructing approximately 2,400 feet of Sunwood Drive between two <br />existing segments of the roadway, completing a 2.3 mile continuous segment between the Sunny <br />Ponds subdivision and Ramsey Boulevard. This particular segment will have the benefit of <br />providing access to vacant land with industrial and commercial potential on both its north and <br />south sides. Major project cost include the construction costs and overhead associated with the <br />roadway, storm sewer, watermain, and sanitary sewer improvements. They may also require the <br />construction of a bridge over protected wetland 673W since a similar bridge was required over <br />wetland 114P between C.S.A.H. #5 and C.R. #57. The total project cost is estimated to be <br />1,000,000. <br /> <br />Riverdale Drive Extension <br /> <br />This project would extend to Riverdale Drive frontage road to Ramsey Boulevard, a signalized <br />access point on T.H./t10. This segment would provide access to the vacant commercial property <br />on both the north and south sides of the development. The project would include the <br />construction of approximately 3,000 feet of roadway and related infrastructure improvements <br />including sanitary sewer, watennain and storm sewer. The total project cost includes <br />construction cost and overhead, as the right-of-way is anticipated to be dedicated by the <br />developer. The estimated cost is $650,000. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.