My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/1998 (2)
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 04/14/1998 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:34:50 PM
Creation date
9/16/2003 2:21:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br />I <br />I <br />I <br /> <br />CASE # 5" <br /> <br />149TH AVENUE TRAFFIC CALMING (IMPROVEMENT PROJECT #98-I5) <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />At the April 14, 1998 Council meeting, discussion continued on what type of traffic calming <br />might be appropriate for the segment of 149th Avenue between Uranirnite Street and Rarnsey <br />Boulevard. ':. ~low is a list of observations. <br /> <br />Speed humps are not the first choice of the neighborhood as a traffic calming solution. <br />A cul-de-sac is the overwhelming choice of the neighborhood as a traffic calming solution. <br />Residents appear agreeable to being assessed for a cul-de-sac. <br />The location of the desired cul-de-sac is uncertain. <br />The Council directed that a feasibility study be done for the installation of a cul-de-sac. <br />Traffic generation fi:om the neighborhood (Ramsey Boulevard to Armstrong Boulevard) will <br />continue to use 149th Avenue after C.IL #116 is extended if it is hot cul-de-saeed. <br />C.R. # I 1 fi extension should elinffnate gilt-through traffic or/ginating and terminating west of <br />Armstrong Boulevard. <br /> <br />In addition, listed below are some staff concerns. <br /> <br /> At least three Councilmembers have expressed that they are not supportive ora cul-de-sac. <br />· Street closure by cul-de-sacing will change neighborhood traffic patterns that have been in <br /> place for nearly twenty y..e,~ <br />· A cul-de-sac on 149tl~buld delay emergency response, and would create operational <br /> problems for the large fire equipment. . <br /> <br />Committee Action: <br /> <br />The goal of this meeting is to provide direction on the desired traffic calming solution that both <br />the neighborhood and Council can support. Enough detail needs to be provided such that a <br />feasibility report can be prepared. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator , <br />Fire Chief/Director of Public Works <br />Police Chief <br />Acting Finance Officer <br /> <br />R&B: 04/21/98 <br /> <br />jmt/149, doc <br /> <br />/.57 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.