My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/1998 (2)
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 04/14/1998 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:34:50 PM
Creation date
9/16/2003 2:21:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> Part 3 - Site Work <br /> <br />20 Granular borrow <br /> <br />21 Class 5 aggregate base <br /> <br />22 Erosion control fence in place <br /> <br />23 Seed with mulch <br /> <br />24 Seed with fiber wood blanket <br /> <br />25 12" CMP with 2 aprons <br /> Part 3 - Site Work <br /> <br />CY <br /> <br />TN <br /> <br />LF <br /> <br />AC <br /> <br />SY <br /> <br />LF <br /> <br /> Part 4 - Water Well No. 4 <br />26 Transporting to and erecting on job <br /> site all necessary equipment, materials <br /> and tools and setting up same LS <br />27 Drive 30 inch casing including drive shoe LF <br />28 Drill 30 inch open hole LF .. <br />29 Place 24 inch casing inside casing and <br /> open hole LF <br />30 Furnish and place neat cement grout <br /> between casings and open drill hole CY <br />31 Dynamite for blasting including labor <br /> for shooting, caps and wire LB <br />32 Bail CY <br />33 Furnish, install and remove ak compression <br /> equipment for air surging of the well LS <br />34 Air surging of the well HR <br />35 Furnish, install and remove test pump for <br /> <br /> capacity test of well LS <br /> <br />36 Test pumping HR <br /> <br />37 Sterilize well, remov6 all tools and <br /> equipment, clean up site and weld on cap LS <br /> Total Part 4 - Water Well No. 4 <br /> <br />Total Part I - Water Well Test Drilling <br /> <br />Total Part 2 - Water Well No. 3 <br />Liquidated Damages on Well No. 3 <br /> <br />Total Pan 3 - Site Work <br /> <br />Total Part 4 - Water Well No. 4 <br /> <br />Total Work Completed to Date <br /> <br />I:~38~3802\REQUST14. WB2 <br /> <br />680 <br /> <br />60 <br /> <br />200 <br /> <br />0.7 <br /> <br />400 <br /> <br />50 <br /> <br /> 1 <br /> <br />120 <br /> <br />180 <br /> <br />160 <br /> <br />15 <br /> <br />200 <br /> <br />200 <br /> <br /> I <br /> <br />lo0 <br /> <br /> 1 <br /> <br />80 <br /> <br />14.00 <br />10.O0 <br />2.50 <br />1.200.O0 <br />3.00 <br />29.00 <br /> <br />4,000.00 <br /> <br /> 143.00 <br /> <br /> 60.00 <br /> <br />57.00 <br /> <br />225 .O0 <br /> <br />10.O0 <br /> <br />50.00 <br /> <br />2,800.00 <br /> <br /> 115.00 <br /> <br />1500.00 <br /> <br /> IO0.O0 <br /> <br />1,2O0.00 <br /> <br />8OO <br /> <br />788 <br /> <br />25 <br /> <br /> 1 <br /> <br />137 <br /> <br />148 <br /> <br />196 <br /> <br />15 <br /> <br />816 <br /> <br />150 <br /> <br /> 1.00 <br /> <br />28.50 <br /> <br /> 1 <br /> <br />31 <br /> <br />11,200.00 <br />7,880.00 <br /> <br /> 725.00 <br /> <br />19,805.O0 <br /> <br />19,591.00 <br />8,880.O0 <br /> <br />11,172.00 <br /> <br />3,375.00 <br /> <br />8,160.00 <br />7500.00 <br /> <br />2,800.00 <br />3,277.50 <br /> <br />1,500.00 <br />3,100.00 <br /> <br />73,355.50 <br /> <br /> 15,940.O0 <br /> 93,570.50 <br /> (7,4O0.00) <br /> 19,805.00 <br /> <br /> 73,355.50 <br />$I95~71.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.