My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 05/12/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:35:03 PM
Creation date
9/16/2003 2:29:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />10. <br /> <br />11. <br /> <br />phases of Apple Ridge, pursuant to the preliminary plat will not be required to pay said <br />$1657.00 per lot charge. <br /> <br />Stormwater Management Fee. The CITY has enacted a Stormwater Management Fee <br />in the amount of $350.00 per lot. A cash payment in the mount of Six Thousand Three <br />Hundred Dollars and no cents ($6,300.00) (18 .lots x $350.00 per lot) is due at the CITY <br />prior to releasing the plat for recording. The stormwater management fee will be utilized <br />for assisting in the construction of a stormwater outlet for Wetland #733W, which the <br />subject development drains into. <br /> <br /> SECTION II <br />STAGE II IMPROVEMENTS AND FINANCIAL GUARANTEES <br /> <br />Stage II Improvements Required. The Stage II Improvements which the CITY <br />requires the DEVELOPER to construct within the Plat are as follows: <br /> <br />a) <br />b) <br />c) <br />d) <br />e) <br />f) <br />g) <br />h) <br />i) <br /> <br />Inspection <br />Street striping and signing <br />Traffic signing <br />Street lights <br />Street sweeping <br />Sealcoating <br />Adjusting water shut-off boxes <br />Maintenance of storm water and facilities <br />Boulevard seeding <br /> <br />("Stage II Improvements") <br /> <br />Payment for Stage II Improvements. The CITY will install in the Plat the Stage II <br />Improvements. The DEVELOPER shall also deposit an amount that is determined by <br />the CITY to be adequate to aid in the operation and maintenance of street lights in <br />locations within the Plat determined by the City Engineer and installed by Anoka Electric <br />Cooperative for the first three (3) years after final plat approval. The CITY will bill <br />residents in the Plat at least quarterly for street light maintenance and operation costs; <br />billing will be initiated at the time a residence connects to municipal water and sanitary <br />sewer. The DEVELOPER will pay to the CITY an amount equal to 100% of the City <br />Engineer's estimated construction cost of the items prior to recording of the final Plat. <br />The City Engineer's estimated cost of construction is: <br /> <br />a) Inspection No charge <br />b) Street striping and signing (1) $120.00 <br />c) Traffic signing SNone <br />d) Street lights (3) $2,700.00 <br />e) Street light maintenance & operation for 3 years $810.00 <br />f) Street sweeping $300.00 <br />g) Sealcoating $2,500.00 <br />h) Adjusting water shut-off boxes No charge <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.