Laserfiche WebLink
16. <br /> <br />17. <br /> <br />18. <br /> <br /> SECTION V <br />TRANSPORTATION AND LANDSCAPING <br /> <br />Park Trail Development Fee. The City Council has enacted a trail development fee in <br />the amount &One Hundred Dollars and no cents ($100.00) per lot. Therefore, a payment <br />in the amount of One Thousand Eight Hundred Dollars and no cents ($1,800.00) (18 lots <br />x $100/lot) is due at the City prior to releasing the Final Plat for recording. <br /> <br />Tree and Sod Planting Plan. If the Stage II boulevard seeding has not established, <br />sodded boulevards, in addition to a front yard tree, are a requirement for each lot in the <br />Plat prior to issuance of a Certificate of Occupancy. The DEVELOPER is required to <br />submit a Landscape Plan for CITY approval that identifies existing tree growth within <br />the Plat that will be preserved during construction and new plantings. The requirement <br />for a Landscape Plan shall be fulfilled by the DEVELOPER as follows: <br /> <br />a) Minimizing the impact of construction on trees in accordance with Minnesota <br /> Extension Service publication "Protecting Trees From Construction Damage" <br /> (Publication//NR-FO-6135-S)... <br /> <br />Planting one two-inch diameter tree (or equivalent thereof) of an approved species at <br />the road frontage or in the front yard of each of the lot in the Plat prior to the <br />issuance of a Certificate of Occupancy. In the event the weather is not conducive to <br />tree or planting sod in the boulevard at the time of Certificate of Occupancy, the <br />Building Permit holder shall place a cash deposit in the amount of $200.00 for trees <br />and $100.00 for sod in an escrow account with the CITY and upon verification of <br />the planting being accomplished, said cash deposit shall be refunded to the Building <br />Permit holder. Failure of the Builder to comply with the planting requirement within <br />a reasonable time frame following a determination by the CITY that weather <br />conditions are conducive to planting shall give the CITY authority to cause the <br />planting, the cost of which shall be charged to the escrow account and the Builder <br />shall not be eligible for a refund of the cash deposit made for this purpose. <br /> <br />Tree Disease Prevention and Disposal. The DEVELOPER shall prevent the <br />introduction and spread of tree disease into the residual tree populations of the Plat and' <br />adjoining properties and reduce the impacts of construction on the residual property of <br />the Plat and adjoining properties. The DEVELOPER, in order to protecting trees from <br />construction damage shall: <br /> <br />a) Install physical barriers, such as snow fence, around trees that are to remain. The <br /> fencing shall be located at the dripline of these remaining trees. <br /> <br />b) <br /> <br />Insure that all equipment operators will have readily available, a tree wound dressing <br />and will apply it immediately to damaged oak trees if wounding occurs from April <br />15 through July 15. <br /> <br /> <br />