My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 05/12/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:35:03 PM
Creation date
9/16/2003 2:29:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering, Inc., dated March 11, 1997, revision date March 4, 1998 and the Tree <br />Preservation Plan prepared by Passe Engineering, Inc. and dated March 18, 1997, <br />revision date February 18, 1998. The final construction plan for the Stage I <br />Improvements shall be submitted to the City Engineer for review and approval prior to <br />commencement of construction. <br /> <br />The DEVELOPER shall be responsible for completing the rough grading and providing <br />lot comer stakes prior to the installation of underground utilities. <br /> <br />Stage I Improvements Completion Date. The Stage I Improvements shall be <br />completed on or before November 15, 1999. <br /> <br />Stage I Improvement Financial Guarantee. The DEVELOPER shall provide a <br />financial guarantee to the CITY guaranteeing the construction of the Stage I <br />Improvements and their timely completion. The financial guarantee shall be in the <br />amount of One Hundred Twenty Eight Thousand Dollars and no cents ($128,000.00), <br />which amount is 125% of the City Engineer's estimated cost of the Stage I Improvements. <br />The financial guarantee required by this paragraph shall be in the form of cash or a letter <br />of credit, approved as to form by the CITY. The financial guarantee shall be deposited <br />with the CITY at the time of execution of this agreement. Upon total completion of <br />Stage I Improvements, acceptance by the CITY, supported by appropriate lien waivers, <br />the DEVELOPER may request a reduction in the amount of the financial guarantee, but <br />only if the maintenance guarantee required by Paragraph 7 below has been deposited. <br /> <br />Stage I Improvement Maintenance Financial Guarantee. In addition to the financial <br />guarantee required by Paragraph 6 above, the DEVELOPER shall also post a Stage I <br />improvement maintenance guarantee with the CITY. Said maintenance guarantee shall <br />be deposited with the CITY at the time Stage I Improvements are accepted by the CITY <br />and prior to release by the CITY of the £mancial guarantee required by Paragraph 6 <br />above. The $10,000 maintenance guarantee shall be held by the CITY for a one (1) year <br />period from the date of its deposit. This financial guarantee is for the purpose of ensuring <br />that the Stage I improvements have been cons~'ucted in accordance with City standards <br />and may be called upon at the CITY'S discretion during said one (1) year period if the <br />CITY determines it necessary to repair and/or replace any of the Stage I improvements. <br />Said finaneiaI guarantee shall be in the form of a letter of credit, approved as to form by <br />the CITY. <br /> <br />Payment of Sewer and Water Trunk Charges. The DEVELOPER shall pay its sewer <br />and water trunk charges of $1,657.00 per residential unit or a total of Thirty Four <br />Thousand Seven Hundred Ninety Seven Dollars and no cents ($34,797.00) (21 x <br />$1,657.00). The CITY will credit against the DEVELOPER'S trunk charge the <br />construction cost of extending sewer and water to the Plat. In addition, the CITY will <br />.credit the DEVELOPER fifteen (15) percent of this construction cost to cover <br />engineering and inspection associated with this extension. The CITY will also credit the <br />construction cost of oversizing the watermain from eight (8) inches to twelve (12) inches <br />against the water trunk charges. Because the construction costs for bringing the sewer <br />trunk and water trunk to the Plat exceed the City's sewer and water trunk charge of <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.