Laserfiche WebLink
APPENDIX A <br /> <br />ALTERNATIVE A PROJECT COSTS (CUL-DE-SAC) <br /> <br />Pavement Removal <br />Grading <br />Class 5 Base <br />Bituminous Wear Course <br />Topsoil <br />Fertilizer, Seed, and Mulch <br />Traffic Control Signage <br /> Total Construction Cost <br />Project Overhead @ 25% <br /> Total Project Cost <br /> <br />1075 yd2 .~ $3/yd2 <br />Lump Sum <br />225 tons ~ $7/ton <br />135 tons ~ $35/ton <br />420 yd3 ~ $10/yd3 <br />0.5 acres ~ $1500/acre <br />Lump Sum <br /> <br />$ 3,225 <br /> 5,000 <br /> 1,575 <br /> 4,725 <br /> 4,200 <br /> 750 <br /> 300 <br /> <br /> 19,775 <br /> 4,944 <br />$24,719 <br /> <br /> <br />