Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />,I <br /> I <br /> <br />MAY- 7-98 THU 13'22 SRF FAX NO. 4752429 P, 04 <br /> <br />TH 47 - Record of Meeting <br /> <br />- 3 - May 4, 1998 <br /> <br />Some people asked about the four proposed traffic signals shown at the following cross streets: <br /> <br />142nd Avenue <br />CSAH 5 (Nowthen Boulevard) <br />149th Avenue/Sunwood Drive <br />153rd Avenue <br /> <br />Representatives stated that each intersection would be studied and the signals would be installed <br />at the same time as the roadway improvements if warrants were met to justify a traffic signal. <br />Mn/DOT representatives stated that the signal at 142nd Avenue requires further study and that a <br />signal at that location has not been approved. Residents that live north of the project commented <br />that the signals would slow their commute and that they were opposed to them. <br /> <br />MDH/smf <br /> <br />Attachments: Attendance Sheet <br /> Project Description Handout <br /> <br />I <br />I <br /> <br />I <br /> <br /> <br />