Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CASE # <br /> <br /> RECEIVE BIDS AND AWARD CONTRACTS <br />FOR THE 1998 STREET MAINTENANCE PROGRAM <br />By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />The 1998 Street Maintenance Program consists of seven crack fill and sealcoat projects <br />covering 12.5 miles of City streets and five overlay projects covering 3.7 miles of <br />residential streets and 4.0 miles of MSA streets. In addition, a separate schedule added a <br />small street reconstruction project in Bums Township adjacent to the Rodeo Hills <br />subdivision which will be receiving a bituminous overlay. The cost of this work will be <br />paid directly by Bums Township. <br /> <br />The 1998 Street Maintenance Program received a public hearing on March 10, 1998, and <br />the Council approved plans and specifications and authorized advertisement for bids on <br />May 12, 1998. Bids were opened on July 8, 1998, and are attached. <br /> <br />The low bidders are as follows: <br /> <br />Division A <br />Division B <br />Division C <br />Division D <br /> <br />Crack Sealing <br />Sealcoating <br />Overlay <br />Bums Township <br /> <br />Northland Sealing-Striping <br />ASTECH Corp. <br />W.B. Miller, Inc. <br />W.B. Miller, Inc. <br /> <br />Cloquet, MN <br />St. Cloud, MN <br />Elk River, MN <br />Elk River, MN <br /> <br />W.B. Miller, Inc. and ASTECH have previously performed work satisfactorily for the <br />City in the past. Northland Sealing-Striping has not performed work for the City in the <br />past and references are being contacted. <br /> <br />Financing: <br /> <br />Financing for Divisions A and B, which will be recommended for award will come from <br />special assessments, and from the City's Public Improvement Revolving funds <br />(PIR)which have been designated for these improvements. <br /> <br />Recommendation: <br /> <br />At this time, staff is recommending award to the low bidders of Division A (crack <br />sealing) to Northland Sealing-Striping, contingent upon satisfactory references and <br />Division B (sealcoating) to ASTECH Corp. in the bid amounts. Division C (Bituminous <br />overlays) will be awarded at a later date since a portion of the contract is associated with <br />state-aid work, which is awaiting MnDOT approval. This was anticipated for mid- <br />August. <br /> <br /> <br />