Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Construction Cost Estimates for <br />Municipal Utilities Extension <br /> To Burger King Site <br /> <br />Sanitary_ Sewer <br /> <br />1050 Ft <br />850 Ft <br />2 each <br />2 each <br />200 fl <br /> <br />27" Sanitary Sewer 18' dp <br />10" Sanitary Sewer 11-18' dp <br />60" Sanitary Manholes <br />48" Sanitary Manholes <br />Bore and Jack Pipe <br /> <br />90/Ft <br />25/ft <br />2000/each <br />1500~each <br />200/ft <br /> <br />Watern~ain <br /> <br />1050 ff 8" Watermain <br />870 ft I2" Watermain <br />5 each Hydrants <br />200 ff Bore & Jack Pipe <br /> <br />22/ft <br />35~fi <br />1500 each <br />200/t~ <br /> <br />Storm and Street Improvements <br /> <br />740 ft 18" Storm Sewer <br />1 each 18" FFS <br />3 each Standard Manholes <br />2 each Standard Catch Basin <br />2000 ft Cone. C & G <br /> <br /> 25/ft <br /> 700 Each <br /> 1500/each <br />· ' 1000/Each <br /> 7.50/ft <br /> <br />Restoration <br /> <br />2700 sq. yd. Pavement Removal <br />1100 ton Class 5 Base <br />500 ton Bituminous <br />4500 yd Sodding <br />1.2 acre Seed and Mulch <br /> <br />2/sq. yd. <br />7/ton <br />27/ton <br />1.50/yd <br />1500/acre <br /> <br />$ 94,500 <br />$ 21,250 <br />$ 4,000 <br />$ 3,000 <br />$ 40,000 <br />$162,750 <br /> <br />$ 23,100 <br />$ 30,450 <br />$ 7,500 <br />5;40,000 <br />$101,050 <br /> <br />$18,500 <br />$ 7OO <br />$ 1,500 <br />$ 2,OOO <br />$15.000 <br />$40,700 <br /> <br />$ 5,400 <br />$ 7,700 <br />$13,500 <br />$ 6,750 <br />$1.800 <br />$35,150 <br /> <br /> <br />