My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/11/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 08/11/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:39:07 PM
Creation date
9/17/2003 11:26:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/11/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CASE # <br /> <br /> REQUEST FOR SITE PLAN APPROVAL; <br />CASE OF BUILDING FASTENERS AND SHARP AND ASSOCIATES <br />By: Sylvia Frolik, Zoning Administrator <br /> <br />Background: <br /> <br />The City of Ramsey has received a request for site plan review and approval from Dennis Sharp <br />of Sharp and Associates Building Fasteners. The plan proposes to construct an office/warehouse <br />facility on Lot 2 of the A.E.C. Energy Park 3rd Addition. The following items are enclosed: <br /> <br />· Site location map <br />· Site plan <br />· City Staff Review Letter dated July 28, 1998 <br />· Draft Planning Cormnission meeting minutes dated August 4, 1998 (will be available <br /> at the meeting) <br /> <br />Observations: <br /> <br />The office warehouse use is consistent with the permitted uses in the Business Warehouse zoning <br />district. The site plan proposes an initial building size of 31,404 square feet with a furore <br />addition of 19,352 square feet. The ultimate facility size complies w/th the 35% lot coverage <br />restriction. In accordance with City Code, the exterior walls of the building are proposed to <br />consist of concrete masonry units. <br /> <br />The plan shows one access onto Sunwood Drive and two accesses onto the future Jasper Street. <br />It has not been determined when Jasper Street will be constructed. Code requires a minimum of <br />1 loading berth; 4 loading docks and 2 overhead doors are proposed. All driveways, parking <br />areas and loading areas are proposed to be surfaced with bituminous and finished with B-612 <br />concrete curbing. <br /> <br />Two waste storage areas are proposed to consist of materials matching the building and this is <br />consistent with the 100% screening requirement in City Code. <br /> <br />The Landscape Plans complies with the 20 foot wide landscape area requirement along Sunwood <br />Drive and the future Jasper Street. Staff has recommended that the Landscape Plan be modified <br />to provide more trees. <br /> <br />The City Engineer will present a verbal report on the grading plan. <br /> <br />The draft Lighting Plan and fixture specifications comply with City Code requirements. <br /> <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.