m <br /> <br /> The City shall acquire 120 feet of right-of-way for Industry Boulevard on an alignment acceptable to <br />IAmoka County. .. <br /> <br /> Th= City shall limit access to the proposed Industry Boulevard by limiting to six (6) accesses to Indusl~ <br /> Boulevard to thc south between CSAH 56 (Kar~ey Boulevard) and CSAH 83 (An-nstrong Boulevard). Fca'the <br />m purpose of ~his provision, a cross street will constitute two (2) access points, onc on of Industry <br /> side <br /> Boulevard. <br /> <br /> 1II. COSTS: <br /> <br /> A. The contract costs of the work, or if the work is not conl~c~ed the cost of all labor, <br />mmaterials, normal engineering costs, and equipment rental required to complete the work, shall constitute thc <br />actual "construction costs" and shall be so referred to herein. "Estimated costs" are good faith projections oftl~ <br />costs which will be incurred far this project. Actual costs may vary and those will be thc costs for which the City <br />will be responsible. <br /> <br /> B. The estimated cost of the total project is $718,262.10. The Cotmty will not pay fur the <br />following: <br /> <br /> 1. The City will pay for 100% of the cost of new sidewalks installed on the project. <br />The estimated cost to the City is zero (0). <br /> <br /> 2. Tho City will pay 100% of the hydrant relocation and gate box adjustment, water, <br />and sewer construction. The estin~ City's cost of these items is zero (0). <br /> <br /> 3. Thc City will pay 100% of the cost of bituminous path. The City's estimated <br />costs for bituminous path pavem~t is $25,755.00. <br /> <br />acquisition. <br /> <br />The City shall pay for all right-of-way as well as all costs of right-of-way <br /> <br /> 5. The total estimated cost to the City for thc construction ofthe project is <br />$25,755.00. Thc City's participation in engineering will be at a rate of 8% of its designated share. The estimated <br />cost to the City for engineering is $2,060.40. <br /> <br />C. The total est/mated cost to the City for the project is $27,815.40. <br /> <br /> D. Upon award of the contract, the City .shall pay to the County, upon written desrmnd by the <br />County, 95% of its portion of the construction costs of the project es-timated at $26,424.63. The City's share of <br />the cost of the project shall include only construction and engineering expenses and does not include <br />administrative expenses incurred by the County. <br /> <br /> E. Upon final completion of the project, the Cit-fs ,tmre c/the constructi~ cost will be <br />based upon actual consmaction costs. If necessary, adjustments to the initial 95% charged will be made in the <br />farm of credit or additional charges tot he City's share. Also, the remaining 5% of the City's portion of the <br />construction costs shall be paid. <br /> <br />IV. TERM: <br /> <br /> This Agreement shall continue until (1) terminated as provided hereinafter, or (2) until the <br />construction provided for herein is completed and payment provided for herein is made, whichever of (1) or (2) <br />shall first occur. <br /> 2 <br /> <br /> <br />