The City shall acquire 120 feet of right-of-way plus all temporaxy easements necessary for the <br />construction of Industry Boulevard on an alignment acceptable to Anoka County.' <br /> <br /> The City shall limit access to the proposed Industry Boulevard by limiting tn six (6) accesses tn Industry <br />Boulevard between CSAH 56 (Ramsey Boulevard) and CSAH 83 (Armstrong Boulevard). For the purpose of this <br />provision, a cross street will constitute two (2) access points, one on each side of Industry Boulevard. <br /> <br />III. COSTS: <br /> <br /> A. The contract costs of the work, or if the work is not contracted the cost of all labor, <br />materials, normal engineering costs, and equipment rental required to complete the work, shall constitute the <br />actual "cometion costs" and shall be so referred to herein. "Esr/mated costs" are good faith projections of the <br />costs which will be incurred for this project. Actual costs may vary and those will be the costs for which the City <br />will be responsible. <br /> <br />The estimated cost oft. he total project is $718,262.10. The County will not pay for the <br /> <br />following: <br /> <br /> 1. The City will pay for 100% of the cost of new sidewalks installed on the project. <br />The esfim~cd cost to the City is zero (0). <br /> <br /> 2. The City will pay 100% of the' hydram relocation and gat~ box adjustment, wa~r, <br />and sewer construction. The estimated City's cost of these items is $1,270.02. <br /> <br /> 3. The City will pay 100% of the cost of bituminous path. The City's estimated <br />costs for bituminous path pavement is $61,921.00. <br /> <br /> 4. The City shall pay for all right-of-way as well as all costs of right-of-way <br />acquisition. <br /> 5. The City will pay for 100% of the'Wetland mitigation. The cost of the wetland <br />mitigation is estimated at $8,672.87. <br /> 6. The total estimated cost to the City for the construction of the project is <br />$71,863.89. The City's participation in engineering will be at a rate of 8% of its designated share. The estimated <br />cost to the City for engineering is $5,749.11. <br /> <br />C. The total estimated cost to the City for the project is $77,613.00. <br /> <br /> D. Upon award of the contract, the City shall pay to the County, upon written demand by the <br />County, 95% of its portion of the construction costs of the project estimated at $73,732.35. The City's share of <br />the cost of the projeot shall include only construction and engineering expenses and does not include <br />administrative expenses incurred by the County. <br /> <br /> E. Upon final completion of the project, the City's share of the construction cost will be <br />based upon actual construction costs. If necessary, adjustments to the initial 95% charged will be made in the <br />form of credit or additional charges tot he City's share. Also, the remaining 5% of the City's portion of the <br />construction costs shall be pa/d. <br /> <br /> This Agreement shall continue until (1) terminated as provided hereinafter, or (2) until the <br />construction provided for herein is completed and payment provided for herein is made, whichever of (1) or (2) <br />shall first occur. <br /> 2 <br /> <br /> <br />