Laserfiche WebLink
CC Regular Session <br />Meeting Date: 06/14/2011 <br />By: Tim Himmer, Engineering/Public <br />Works <br />5.9. <br />Title: <br />Accept Plans and Specifications, and Authorization to Bid City Improvement Project #10 -25; Chameleon Street <br />Paving <br />Background: <br />A petition was received from 12 of the 20 property owners having frontage on Chameleon Street on February 2, <br />2010 for the bituminous paving of Chameleon Street, between 173rd Ave and 176th Lane, in the Shawn Acres <br />subdivision. This petition was received by the Council on February 23, 2010, and a feasibility study was <br />ordered. The feasibility study was completed and discussed by the Public Works Committee on June 15, 2010. <br />The public hearing for the project was held by the City Council on August 24, 2010, and the project ordered on <br />October 26, 2010. At the time the project was ordered one change was made to the feasibility study, which was to <br />apply a single assessment share to the property at 17310 Chameleon Street due to the combination of two separate <br />parcels into one. <br />The project is proposed to grade and pave a 28 foot wide road centered within the existing 66 foot right of way. <br />The pavement section will consist of four inches of class 5 granular base, two inches of bituminous base course, and <br />1.5 inches of bituminous wear course. This project will also include the grading of ditches alongside the roadway <br />and new culverts will be placed beneath driveways to improve drainage. Storm water improvements will direct <br />drainage to discharge into utility easements dedicated on the plat of this subdivision, or acquired through the <br />process. <br />Notification: <br />Observations: <br />Staff has completed all field work and the final design is substantially complete. A neighborhood open house has <br />been scheduled for June 15, 2011 to provide the residents with a project update, and discuss some of the drainage <br />concerns that have brought to our attention throughout the process (see attached letter). Following the open house <br />revisions can be made to the plans (if necessary) to address any remaining concerns, and the project can be let for <br />bidding. It is anticipated that Council will be considering an award of contract for this project on July 12, 2011, <br />and construction would commence around August 1st. <br />Recommendation: <br />Staff recommends accepting the plans and specifications for City Improvement Project 10 -25; Chameleon Street <br />paving, and authorizing the project for bid. <br />Funding Source: <br />The total cost of the project is estimated to be $300,000, and is anticipated to be financed as follows: <br />• $149,000 City General Fund (includes asmt. for Shawn Acres Park, and additional share for previous lot <br />combination) <br />• $26,000 Storm Water Utility <br />• $125,000 Property Assessments <br />Council Action: <br />