Laserfiche WebLink
Table 3 <br />2011 Street Maintenance Program <br />Bituminous Overlay Quantities <br />Project Description Length Area Bitum. Tack Coat Milling Shoulder Patching <br />Mi Sq Yds Tons Gals Sq Yds CL Ft Tons <br />11 -05 157th Lane 0.41 7,034 580 703 85 4.1 _ <br />11 -06 Oak Run 0.43 7,708 636 771 80 4.3 <br />11 -06 Stanhope River Hills 0.49 10,838 894 1,084 100 4.9 <br />11 -06 Oakridge Estates 0.21 4,560 376 456 35 2.1 <br />11 -06 Total 1.13 23107 1906 2311 215 0 11.3 <br />Totals 1.54 30141 2487 3014 300 0 15.4 <br />11 -05 157th Lane <br />11 -06 See Table 3 for list <br />Table 4 <br />2011 Street Maintenance Program <br />Bituminous Overlay Costs <br />Curb or Contracted City Total <br />Bitum. Tack Coat Milling Shoulder Striping Misc Const Constrct Patching Construction <br />Cost Cost Cost Cost Costs Cost Cost Cost Cost <br />$ 34,821 $ 1,583 $ 850 $ 5,178 $ - $ 849 $ 43,280 $ 820 $ 44,100 <br />$ 114,379 $ 5,199 $ 2,150 $ 14,328 $ - $ 2,721 $ 138,776 $ 2,260 $ 141,036 <br />Totals $ 149,199 $ 6,782 $ 3,000 $ 19,505 $ - $ 3,570 $ 182056 $ 3,080 $ 185,136 <br />