My WebLink
|
Help
|
About
|
Sign Out
Home
06/16/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
06/16/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:16:26 AM
Creation date
9/18/2003 11:37:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
06/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE #2 <br /> <br />UPDATE ON C.R. #116 <br />(IMPROVEMENT PROJECT #97-25) <br />By: Steve Jankowski, City Engineer <br /> <br />Background: : <br /> <br />The extension of C.R. #116 between C.R. #56 and C.R. #83 has been scheduled for construction <br />for late 1998. The County has hired SRF, Inc. to prepare plans and specifications for the <br />roadway. The City of Ramsey is providing right-of-way for the project and has initiated actions <br />to address wetland mitigation which has been determined to be unavoidable. At this time the <br />following activities have been completed: <br /> <br />An environmental assessment worksheet has been prepared and submitted for agency <br />comment. The Comment period ends on June 17, 1998. <br /> <br />The eminent domain proceedings for acquisition of the necessary right-of-way and <br />wetland mitigation area have been commenced, and the City will acquire title to the land <br />on July 15, 1998. <br /> <br />An engineer's estimate has been prepared and is attached. This estimate shows the City <br />having an 11.7% share of the construction costs or a total amount of $71,504. This cost <br />is attributable to two project elements. First is a bituminous path which will parallel the <br />roadway on the north. The second element includes the excavation of wetland beyond <br />what was needed by the project for mitigation. This wetland was proposed to be <br />excavated solely for the purpose of partially compensating the landowner for the purchase <br />of property. <br /> <br />Committee Action: <br /> <br />Based upon discussion. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />City Attorney <br />Public Works Director <br />Finance Officer <br /> <br />R&B: 6/16/98 <br /> <br />/kas <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.