My WebLink
|
Help
|
About
|
Sign Out
Home
06/16/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
06/16/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:16:26 AM
Creation date
9/18/2003 11:37:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
06/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steve Jankowski <br />Page 2 <br />June 10, 1998 <br /> <br />II. Technical Services <br /> <br />Services provided by Hakanson Anden;on Associates, inc.: <br /> <br />· Provide construction staking a:nd inspection. <br />· Preparation of as-built plans. <br />· Order and review soil boring and testing. <br /> <br />Estimated cost of technical services provided by <br />Hakanson Anderson Associates: <br /> <br />$10,800 <br /> <br />Services provided by STS Consultants. Ltd.: <br /> <br />· Soil borings <br />· Compaction testing <br /> <br />Estimated cost of technical services provided by STS Consultants: ~ 1,900 <br /> <br />i11. A & R Manufacturing .Site <br /> <br />· Prepare Grading & Drainage Plan <br />· Review Runoff & Ponding Requirements <br /> <br />Estimated "not to exceed" cost: <br /> <br />$ 1,800 <br /> <br />All of the above costs are based on our current hourly rates and the estimated cost <br />of the basic engineering services is a !'not to exceed" cost. The cost of the technical <br />services is an estimated cost and will.depend on th~ contractor and the weather <br />conditions during construction. We will bill the cost of soil borings and compaction <br />testing at the actual cost plus five percent for administration. <br /> <br />Following is a proposed schedule based on a start date of June 17, 1998. <br /> <br />TASK <br />Prepare plat and plans a. nd specifications and submit to <br />reviewi" g agencies for permits <br />Submit 'o City Council to set the bid date <br />Award bids <br />Begin construction <br />Complete construction and restoration <br /> <br />COMPLETION DATE <br /> <br /> July 24, 1998 <br />July 28, 1998 <br />August 25, 1998 <br />September 7, 1998 <br />October 31, 1998 <br /> <br />Hakanson <br />Anderson <br />Assoc.. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.