My WebLink
|
Help
|
About
|
Sign Out
Home
06/16/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
06/16/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:16:26 AM
Creation date
9/18/2003 11:37:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
06/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is our understanding the the drainage ditch to the south will have a pipe laid within the <br /> the ditch and be filled over. We will be allowed to connect to this drainage system for U~: <br /> our storm sewer. Based upon the actual placement of the ditch with relation to this site/? <br /> it may be necessary to park or drive over the ditch. If the ditch falls within the easemtnt, and <br /> or parking and driving will not be allowed, we need to ke notified prior to start of construction. <br />· i'~ It is also our understanding that sewer and water laterals will be studded into the site and we <br />"" "~: ....:":will have the option of to do all roof top drainage either ~ internal drainage or as run-off. <br /> <br />A1 Gilme'r <br /> <br />cc. Todd Peterson (Highland Bank) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.