My WebLink
|
Help
|
About
|
Sign Out
Home
08/18/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
08/18/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:16:51 AM
Creation date
9/18/2003 11:42:58 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
08/18/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br /> <br /> REVIEW PUBLIC WORKS <br />CAPITAL IMPROVEMENT PROGRAM 1999-2003 <br /> <br />Background: <br /> <br />The purpose of this case is to review projects associated with the public works portion of the <br />City's overall Capital Improvement Program. A number of projects have been completed, or are <br />anticipated to be completed or underway in 1998, and therefore have been eliminated from the <br />proposed draft attached. These projects include: <br /> <br /> Business Park 95 7th Addition and 5th Addition streets, water utility, and sewer utility <br /> projects (under construction) <br />· Watermain looping, City Hall to 151st Avenue and McKinley Street-Deal property to Jaspar <br /> Street (fall projects) <br />· Katnis property redevelopment (deleted) <br />· Comprehensive Water Study (fall start) <br /> <br />Two new projects have been proposed to be added to the five-year CIP. These include the <br />construction of Jaspar Street from 143rd to Sunwood Drive, and the development of the former <br />landfill property with interior streets, sewer and water similar to the Business Park 95 <br />development. These projects have been proposed for 2001 and 2002 respectively. <br /> <br />In addition to the projects which have been scheduled for the next five years, staff has identified <br />several additional projects which are proposed to have implementation priorities which extend <br />beyond 2003. These projects include: <br /> <br />· Sunwood Drive west of Ramsey Boulevard <br />· Extension of 143rd Avenue east to C.R. #116 <br />· 167th Avenue from Variolite Street to C.S.A.H. #5 <br />· Street, sewer and water development through the east half of Section 28 <br /> <br />It is desired for the Committee to review these projects and schedules and make desired changes. <br /> <br />Committee Action: <br /> <br />Review public works CIP and direct modifications as desired. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Director of Public Works <br />Finance Officer <br /> <br />R&B: 08/18/98 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.