Laserfiche WebLink
CASE #1 <br /> <br />LOCATION AND FLOOR PLAN OF STATION #2 <br /> By: Dean Kapler, Fire Chief <br /> <br />Background: <br /> <br />Preparation for the proposed expansion into the second fire station facility is moving along <br />nicely. The point of this case is to present the logic in selecting the 161st and Armstrong <br />Boulevard as the site of choice by the Fire Department and to review the floor plan of the <br />building. <br /> <br />Much care has been taken to assure maximum safety of both firefighters and the public in the <br />response to the station location by firefighters in their personal vehicles along with the response <br />of emergency vehicles from the station to the incident address. <br /> <br />The floor plan includes a substantial training area that can also be utilized for activities such as a <br />polling station and other community meeting events. Also included in the plan is a second floor <br />to provide additional area for future activities such as sleeping quarters for firefighters and even a <br />temporary shelter for families in case of a major, natural or man-caused disaster. The floor plan <br />and location map are included in your agenda. <br /> <br />Board Action: <br /> <br />Based upon discussion. <br /> <br />Reviewed by: <br /> <br />Fire Chief <br /> <br />FB: 03/26/98 <br /> <br />Copies also distributed to: <br />City Administrator <br /> <br />2ndsta. doc <br /> <br /> <br />