Laserfiche WebLink
culvert. The culvert shall be installed within 45 days of the issuance of the permit so that it <br />will be functional to handle precipitation/melt events which occur in the spring of 1997. <br /> <br />The applicant shall stabilize the back slopes of the fill over those sections of the roadway <br />which have been elevated more than t2 inches from the filling. This shall be done by <br />placing straw over the roadway and backslopes, and seeding the backslope and outermost <br />five feet of the roadway with oats or annual rye. This work should be completed prior to <br />April 15, 1997. <br /> <br />The applicant shall re-grade all borrow areas such that the slope is no greater than three <br />horizontal to one vertical. The slopes should be seeded with oats or annual rye and <br />mulched with straw. This work should be completed by June 15, 1997. <br /> <br />Council Action: <br />Motion to adopt Resolution ~97-01~>~'~ adopting the findings of fact. <br />- and - ~.,x ~}Lq <br />Motion to adopt Resolution ~7-0I-XX approving issu~ce ~d te~s of ~e mining and ~ing <br />pe~it. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br />Zoning Administrator <br /> <br />CC: 01/14/97 <br /> <br />/jmt <br /> <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />