Laserfiche WebLink
No. <br /> <br />Item <br /> <br />Unit <br /> <br />Removal of existing submersible turbine pump <br />and motor, installation of new pump and motor, <br />modify surface discharge and pump house <br />piping. LS <br /> <br />Furnish and install variable frequency drive <br />electrical equipment, all electrical work and <br />including floor cutting and repair. <br /> <br />Total Work Completed to Date <br /> <br />LS <br /> <br />Alternate No. 1 - Salvage Existing Pump <br />Salvage value of the existing well pump, motor <br />column and cable, deduct from Base Bid for <br /> <br />the Contractor taking possession of unit. LS <br /> <br />Total Work Completed To Date <br /> <br />Contract <br />Quantity <br /> <br />Unit <br />Price <br /> <br />I $12,299.75 <br /> <br />I $24,974.85 <br /> <br />Quantity <br />to Date <br /> <br />100.00% <br /> <br />100.00% <br /> <br />1 ($400.00) 100.00% <br /> <br />Amount <br />to Date <br /> <br />12,299.75 <br /> <br />24,974.85 <br /> <br />(400.0O) <br /> <br />$36,874.60 <br /> <br />1:\438~3804\REQUEST2.WB2 ~'~'"~ <br /> <br /> <br />