Laserfiche WebLink
I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />i <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br /> <br />Local Agency and <br />Contact Person <br />City of Ramsey <br />Steve Jankowski 427-1410 <br /> <br /> Municipal Agreement Program <br /> Fiscal Year 1998 <br />Successful Projects contingent on resolving <br />access issues, benefits, and funding * <br /> Category and <br /> <br />Project Description <br />TH 47 between 142nd and CSAH 5 <br />Widening, turn lanes ~ 2 int. <br />Signal system at CSAH 5 <br />Project cost $765,000 <br />Local cost: <br />City $71,000 <br />County $189,000~ <br />AM funding $400,000. <br />City Project, Phase II, to be <br />built at City cost. <br /> <br />Comments <br />Management/Safety <br />Further discussion must take <br />place to develop the right picture. <br />Need to include a RTL at the <br />City Street opposite of CSAH 5. <br />Look at median closure at 142nd. <br />Lump sum of $400,000 based on <br />the City developing a layout that <br />is approved by the City, County. <br />and Mn/DOT. See note below. <br /> <br />City of Eagan <br />Tom Colbert 681-4600 <br /> <br />TH 13 @ Blackhawk Rd. <br />Widening, turn lanes, signals <br />Project cost $325,000 <br />Local cost $75,000 <br />Requested AM funding $250,000 <br /> <br />Management/Capacity <br />If TH 13 is to become a principal <br />arterial, a corridor study should <br />be performed. Issues regarding <br />access spacing & signals need to <br />be addressed. See note below. <br /> <br />City of Edina <br />Fran Hoffman 927- 8861 <br /> <br />TH 62 ~ France Ave. <br />Interchange improvement <br />Signal Reconstruction <br />Project cost $400,000 <br />Local cost $200,000 <br />Requested AM funding $200,000 <br /> <br />Management/Capacity <br />Need a more thorough study <br />to develop the right picture. <br />See note below. <br /> <br />The above projects were not considered to be successful projects based on the layouts and issues <br />presented to the selection committee. They may, however, be funded through the Municipal <br />Agreements Program for FY '98 if layouts are developed in cooperation with Mn/DOT and are <br />approved by both the local agencies and Mn/DOT. This process may require that the projects be <br />resubmitted to compete for FY '99 Municipal Agreement funds. <br /> <br />10' Trail on CSAH 6 Bridge <br />Bridge widening over 1-694 <br />Project cost $250,000 <br />Local cost $0.00 <br />Requested AM funding $250,000 <br /> <br />City of Oakdale <br />Brian Bachmeier 739-5086 <br /> <br />Safety <br />Mn/DOT Bridge policy allows <br />for 25% participation on Bridge <br />widenings for walkways on <br />non-interchange bridges over <br />Trunk Highways. Approved <br />funding is $62,500. Can City <br />fund the $187,5007 <br /> <br />Note: 8% will be added to each of the above listed AM funding totals for construction engineering. <br /> <br /> <br />