• Access - what is the preferred /required access route for import trucking, this could be based upon placement <br />location <br />• Erosion control measures - who is responsible for the installation of perimeter controls, turf establishment, & <br />street sweeping along the haul routes <br />Once direction is received a final fill placement plan can be prepared that outlines all the information discussed <br />above. We would also need to secure a Watershed permit, as the current permit is good for the implementation of <br />the previous RTC grading plan and wetland impacts are proposed under this grading and fill analysis. <br />Funding Source: <br />Funding for the Landform work to date, to complete the mass grading plan and cut /fill analysis, was funded through <br />the HRA. Funding to import material to the COR for the implementation of the mass grading plan will be discussed <br />and developed as part of the policy discussion. <br />Staff Recommendation: <br />Staff is seeking direction from the Committee on the items identified above to formalize a policy for soil import <br />into the COR. <br />Committee Action: <br />Based upon discussion. <br />Mass Grading Plan <br />Cut/Fill Analysis <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson MaryJo Warner 06/16/2011 03:42 PM <br />Kurt Ulrich Jo Thieling 06/16/2011 03:58 PM <br />Form Started By: Tim Himmer Started On: 06/16/2011 01:53 PM <br />Final Approval Date: 06/16/2011 <br />