<br />January 31, 1997
<br />
<br />Mr. Steve J. Jankowski, P.E.
<br />City of Ramsey
<br />15153 Nowthen Blvd. NW
<br />Ramsey, MN 55303
<br />
<br />Re: Well No. 1 VFD Installation
<br /> File No. 43804
<br />
<br />Bonestroo, I?osene, Anderlik and Associates, lnc. i$ an Affirmative Action/Equal Opportunity Employer
<br />
<br />Principals: Otto G, gonestroo, P.E. · Joseph C. Anderlik, RE, · Marvin L. Sorvala, P.E. -
<br />Richard E. Turner, P.E. · Glenn R. Cook, RE, · Thomas I~. Noyes, RE, · Robert G. Schunicht, RE. ·
<br />Jerry A. Bourdon. RE, · Robert ~g/. Rosene, RE. and Susan M. Eberlin, CRA., Senior Consultants
<br />
<br />Associate Principals: Howard A. Sanford, P.E. · Keith A. Gordon, P.E. · Robert R. Pfeffede, RE. ·
<br />Richard ~'. Foster, RE. · David O. Loskota, RE. · Robert C. Russek, A.LA. · Mark A. Hanson, P.E. ·
<br />Michael T, Rautmann, P.E. · Ted K.Field, RE. · Kenneth E Anderson, RE. · Mark R. Rolfs, RE, ·
<br />Sidney R VC'illiamson. RE., L.$. · Robert I~ Kotsmith
<br />
<br />Office:;: St. Paul, Rochester. Willmar and St. C)oud, MN · Mequon, WI
<br />
<br />Dear Steve:
<br />
<br />As requested during our meeting on Monday, January 27, 1997, we have reviewed the change
<br />order requests and cost summaries submitted by E. H. Renner & Sons, Bacon's Electric Co. and
<br />Specified Mechanical Systems. These requests include work that was not included in the original
<br />contract and was not associated with determining the solution to the harmonic interference
<br />problem.
<br />
<br />Our evaluation of the extra work is as follows:
<br />
<br />Bacon's letter of August 1, 1996 requesting $1,783.00. Item. B) is for control wiring,
<br />conduit, etc. to connect to the existing supervisory controls. This wiring will change
<br />the variable frequency drive (VFD) from a preset, lower speed to maximum speed if a
<br />low tower level signal is received. We estimate the value of this work to be $365.00.
<br />
<br />Bacon's invoice number 00212'78-LN dated 10/31/96 in the amount of $1,535.00. This
<br />work included the following:
<br />
<br />Determining the wi. ring connections required to control the chemical feed
<br />equipment for Well No. 1.
<br />Installing the relays, pushbutton and wiring required to interface the PLC
<br />contacts with the VFD and the chemical feed equipment. The relays and
<br />pushbutton were furnished by Specified Mechanical Systems.
<br />Installing the Well No. 1 motor leads in EMT inside the switchboard to
<br />prevent harmonics from being induced into other circuits in the
<br />switchboard. We estimate the value of this work to be $1,095.00
<br />
<br />Specified Mechanical Systems letter of December 13, 1996 to E. H. Renner listing
<br />expenses of $9,022.50. The electrical supplies included three relays and a pushbutton
<br />that were instal!ed by Bacon's. We estimate the value of this equipment to be $110.00.
<br />
<br />2335 West Highway 36. St. Paul, MN 55113-3898 · 612-636-4600