Laserfiche WebLink
Bonestroo <br /> Rosene <br />1--1 <br /> Anderlik & <br /> Associates <br /> <br />Engineers & Architects <br /> <br />January 31, 1997 <br /> <br />Mr. Steve J. Jankowski, P.E. <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303 <br /> <br />Re: Well No. 1 VFD Installation <br /> File No. 43804 <br /> <br />Bonestroo, I?osene, Anderlik and Associates, lnc. i$ an Affirmative Action/Equal Opportunity Employer <br /> <br />Principals: Otto G, gonestroo, P.E. · Joseph C. Anderlik, RE, · Marvin L. Sorvala, P.E. - <br />Richard E. Turner, P.E. · Glenn R. Cook, RE, · Thomas I~. Noyes, RE, · Robert G. Schunicht, RE. · <br />Jerry A. Bourdon. RE, · Robert ~g/. Rosene, RE. and Susan M. Eberlin, CRA., Senior Consultants <br /> <br />Associate Principals: Howard A. Sanford, P.E. · Keith A. Gordon, P.E. · Robert R. Pfeffede, RE. · <br />Richard ~'. Foster, RE. · David O. Loskota, RE. · Robert C. Russek, A.LA. · Mark A. Hanson, P.E. · <br />Michael T, Rautmann, P.E. · Ted K.Field, RE. · Kenneth E Anderson, RE. · Mark R. Rolfs, RE, · <br />Sidney R VC'illiamson. RE., L.$. · Robert I~ Kotsmith <br /> <br />Office:;: St. Paul, Rochester. Willmar and St. C)oud, MN · Mequon, WI <br /> <br />Dear Steve: <br /> <br />As requested during our meeting on Monday, January 27, 1997, we have reviewed the change <br />order requests and cost summaries submitted by E. H. Renner & Sons, Bacon's Electric Co. and <br />Specified Mechanical Systems. These requests include work that was not included in the original <br />contract and was not associated with determining the solution to the harmonic interference <br />problem. <br /> <br />Our evaluation of the extra work is as follows: <br /> <br />Bacon's letter of August 1, 1996 requesting $1,783.00. Item. B) is for control wiring, <br />conduit, etc. to connect to the existing supervisory controls. This wiring will change <br />the variable frequency drive (VFD) from a preset, lower speed to maximum speed if a <br />low tower level signal is received. We estimate the value of this work to be $365.00. <br /> <br />Bacon's invoice number 00212'78-LN dated 10/31/96 in the amount of $1,535.00. This <br />work included the following: <br /> <br />Determining the wi. ring connections required to control the chemical feed <br />equipment for Well No. 1. <br />Installing the relays, pushbutton and wiring required to interface the PLC <br />contacts with the VFD and the chemical feed equipment. The relays and <br />pushbutton were furnished by Specified Mechanical Systems. <br />Installing the Well No. 1 motor leads in EMT inside the switchboard to <br />prevent harmonics from being induced into other circuits in the <br />switchboard. We estimate the value of this work to be $1,095.00 <br /> <br />Specified Mechanical Systems letter of December 13, 1996 to E. H. Renner listing <br />expenses of $9,022.50. The electrical supplies included three relays and a pushbutton <br />that were instal!ed by Bacon's. We estimate the value of this equipment to be $110.00. <br /> <br />2335 West Highway 36. St. Paul, MN 55113-3898 · 612-636-4600 <br /> <br /> <br />