My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/22/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 04/22/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:15:21 PM
Creation date
9/19/2003 11:32:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/22/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No. Item Unit <br /> <br />I Mobilization, transporting equipment <br /> and material to test hole site, setting <br /> up equipment at test site, demobilization <br /> and miscellaneous costs LS <br />2 Drill open hole for 4 inch casing LF <br />3 Place 4 inch casing in open hole LF <br />4 Place neat cement grout between open <br /> hole and 4 inch casing BG <br />5 Drill 4 inch open hole LF <br />6 Airlift test hole to clean HR <br />7 Gamma log test hole Lq <br /> Total Part 1 - Water Well Test Drilling <br /> <br /> Part 2 - Water Well No. 3 <br />8 Transporting to and erecting on job site <br /> all necessary equipment, materials and <br /> tools and setting up same LS <br />9 Drive 30 inch casing including drive shoe LF <br />10 Drill 30 inch open hole LF <br />11 Place 24 inch casing inside casing and <br /> open hole LF <br />12 Furnish and place neat cement grout <br /> between casings and open drill hole CY <br />13 Dynamite for blasting including labor <br /> for shooting, caps and wire LB <br />i4 Bail CY <br />15 Furnish, install and remove air compression <br /> equipment for air surging of the well LS <br />16 Air surging of the well HR <br />17 Furnish, install and remove test <br /> <br /> pump for capacity test of well LS <br /> <br />18 Test pumping I-I;R <br /> <br />19 Sterilize well, remove all tools and <br /> equipment, clean up site and weld on cap LS <br /> Total Part 2 - Water Well No. 3 <br /> <br />I :",,438M-3802\REQ U ESTT.WB2 <br /> <br />Contract <br />Quantity <br /> <br /> 1 <br /> <br />t50 <br /> <br />150 <br /> <br />70 <br /> <br />150 <br /> <br /> 2 <br /> <br /> 1 <br /> <br /> 1 <br /> <br />120 <br /> <br />180 <br /> <br />160 <br /> <br />15 <br /> <br />200 <br /> <br />200 <br /> <br /> 1 <br /> <br />100 <br /> <br /> 1 <br /> <br />80 <br /> <br />Unit <br />Price <br /> <br />5,000.00 <br /> <br /> 20.00 <br /> <br /> 8.00 <br /> <br /> I0.00 <br /> <br /> 20.00 <br /> <br /> 150.00 <br />1,200.00 <br /> <br />5,000.130 <br /> <br /> I43.00 <br /> <br /> 60.00 <br /> <br />57.00 <br /> <br />225.00 <br /> <br />I0.00 <br /> <br />50.00 <br /> <br />2,800.00 <br /> <br /> 115.00 <br /> <br />1,500.00 <br /> lo0.00 <br /> <br />1,200.00 <br /> <br />Quantity <br />to Date <br /> <br /> 1 <br /> <br />210 <br /> <br />210 <br /> <br />40 <br /> <br />158 <br /> <br /> 2 <br /> <br /> I <br /> <br /> 1 <br /> <br />165 <br /> <br />180 <br /> <br />225.5 <br /> <br />20.3 <br /> <br />392 <br /> <br />157 <br /> <br /> 1 <br /> <br />112.5 <br /> <br /> 1 <br /> <br />65.5 <br /> <br />Amount <br />to Date <br /> <br />5,000.00 <br />4,200.00 <br />1,680.00 <br /> <br />'400.00 <br />3,160.00 <br />300.00 <br />1,200.00 <br /> <br />15,940.00 <br /> <br /> 5,000.00 <br /> <br />23,595.00 <br />I0,800.00 <br /> <br />12,853.50 <br /> <br />4,567.50 <br /> <br />3,917.00 <br />7,850.00 <br /> <br />2,800.O0 <br />12,937.50 <br /> <br />1,500.00 <br />6,550.00 <br /> <br />1,2O0.O0 <br /> <br />93,570.50 <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I: <br /> I <br /> I <br /> I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.