Laserfiche WebLink
I <br /> I <br />'1 <br /> ! <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />Trail Link #3: 153rd Av Connection Estimated Costs <br /> <br />8' Bituminous Trail (4" compacted class 5 base and 2" compacted bituminous mat) <br />830' ~ $§.25/lnft =$6,848 <br /> <br />Total estimated eom =$6,848 <br /> <br /> <br />