Laserfiche WebLink
1/7/97 <br /> <br /> A.E.C. "COTTONWOOD" PARK <br />ESTIMA TED PROPOSED TRAIL COSTS <br /> <br /> The estimated trail costs were derived from the linear footage of specific trails and <br />trail types, as well as accessory features and plantings that were derived from the 1/7/97 <br />draft plan. The financial breakdown per item as well as an item description at an installed <br />price are listed as follows. <br /> <br />8' Bituminous Trail ( 4" compacted class 5 base and 2" compacted bituminous mat) <br /> 3,780' ~ $10.00/FT. =$37,800 <br /> <br />6' Constructed Boardwalk(floatation walk) , <br /> 60' ~ <br /> <br />$40.O0/FT. = $2,400 <br /> <br /> Geotextile ground stabilizer 300' ~ $0.75/lnft <br />Accessory Furniture(picnic benches, one-sided benches, signs) <br /> (picnic tables) <br /> <br /> 8 @ 750.00 <br /> (one-sided benches) <br /> I0 ~ 500.00 <br /> (signage) <br /> allowance <br /> (garbage receptacles) <br /> 4 @ 5o0.00 <br />Plantings( 1" dia. shade trees, bareroot) <br /> 75 ~ $100.00 <br /> <br />(prairie seed mix and seedlings to fix up disturbed areas) <br /> 1 acre ~ $2,500 <br /> <br />= $225 <br /> <br />$6,000 <br />$5,000 <br /> <br /> $500 <br />$2,000 <br />$7,500 <br />$2,500 <br /> <br />Light standards (not including around 3800' underground wiring) <br /> 38 @ $300.00 <br /> <br />= $11,400 <br /> <br />Total estimated costs for the proposed trail development within the Park <br /> <br />=$75~25 <br /> <br /> <br />