My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/27/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 05/27/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:16:41 PM
Creation date
9/19/2003 11:57:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/27/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADVeRTISEMeNT FOR BEDS <br /> <br />PARK Sfl'ELTER SPECIFICATIONS <br /> <br />I <br />I <br /> <br />The purpose of this bulletin is to request sealed bids for the "turnkey" provision of two shelters in different <br />parks. Both parks are in the southeast quadrant of the City and are approximately 1-1/4 mile apart. Emerald <br />Pond Park has el¢c~c power on site, Rivers Bend Park does not. Sealed bids must be received by I0:00 a.m. <br />on Wednesday, May 14, 1997 at Ramsey City Hall, 15153 Nowthen Boulevard, NW, Ramsey, IvIN 55303. The <br />envelope should be marked "Park Shelter Bid" and also contain a 5% bid bond. <br /> <br />I <br />I <br /> <br />The City intcmds on fiT~mediate conskmcfion of both shelters during 1997. The hexagonal shelters will be 35 feet <br />across (795 square feet), with a 4/12 pitched roof or greater. Below are additional details that must be <br />addressed in your bid. Any requested deviation in these specifications must be clearly pointed out by the <br />bidder. <br /> <br /> 35 foot hexagonal shelter must include six glue-laminated support columns and no center support - specify <br /> whether or not the exposed portions of the supports are treated. <br />· The shelter must include connecting hardware of a minimum thickness of 1/4dnch plate steel. <br /> Roof decking shall be 2 × 6 or larger, kiln-dried lumber (specify grade), selected for appearance and be <br /> "edge reed" or tongue & groove (p~ease specify), fascia must be 2 x 6 No. 1 Grade lumber, preferably <br /> rough sawn exterior (specify). <br />· Roof must be rated for a 40 psf live load (or approved by Ramsey's Building Official ~ specify). <br />· Thc four-inch concrete floor must be poured over compacted base material. (Specify whether thc floor will <br /> have rcinforccm6nt wire or bc fiber-con.) <br />· Concrete control joints should nm comer to comer (resulting in an astcu%k pattern converging in the center <br /> of the floor). <br />· Concrete should extended eight inches beyond thc drip line of thc roof and slope from the support posts at <br /> more than one percent, but less than two percent, in grade. The perimeter portion of the slab (16") shall be <br /> i2" fin thickness. <br />· 20-year asphalt shingle roofing (with cedar option - #1 grade) should be over felt underlayment with <br /> pcn-kneter drip edge. <br /> <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br /> <br />Th!follov, dng should include all costs, including but not limited to shipping, tax, materials, and installation. <br /> <br />Cost for one only shelter $ $24,800.00.. , Option for cedar shingles (vs. asphal0$. $4,200.00 <br /> <br />Cost for two shelters $ $ 48,420.. 00 , Option for cedar shingles (vs. asphalt) $ $ 8,300.00 <br /> <br /> weeks <br />Completion date 8 - 9>~a?~J after award. Guaranteed time ofcompledon August 2 .., t997. <br /> <br />Cupola - provide detail with all dimensions. $__ * see below <br />Please note: The City intends on the purchase of the cupola with both shelters. <br /> <br />The City reserves the fight to reject any or all bids, or to waive informalities or to award each shelter to a <br />d/fferent vendor. Further, it is possfble that bidders that cannot provide construction plans or examples of <br />hexagonal shelters in the North Metro Area might not be considered. In addition, the City reserves the fight to <br />assign liquidated damages of $20 per day ($10 per shelter) for non-completion of the project by the agreed <br />upon time. * 1 Shelter 2 Shelters <br /> With Asphalt $1,i40.00 $1,475.00 <br />@colleen\correspkmarkb\l 997~parkskrfpshelt.doc <br /> With Cedar $2,200.00 $2,800.00 <br /> <br /> I <br /> I <br />(negotiablei <br /> <br /> ! <br /> ! <br /> ! <br /> ! <br /> <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.