My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 06/10/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:16:55 PM
Creation date
9/22/2003 9:28:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approximate Cost Analysis of Phase One and Two of Alpine Park <br /> <br />phase One includes all initial rough grading and revegetation to limit erosion for entire site including <br />western portion of site that is proposed as phase two. Cost estimates and type of work are listed as follows. <br /> <br />Grading $ 27,800.00 <br /> <br />Revegetation <br /> <br />Trees (1,000-1" bareroot <br />includes mulching and initital <br />maintenance <br />Prairie Restoration (20 acres <br />includes erosion controll <br />measures <br />Turf (2.5 acres includes <br />erosion control measures <br /> <br />$ 40,000.00 <br /> <br />$ 30,000.00 <br />$ 7,000.00 <br /> <br />Parking Area and Drive (east side) <br /> Curb and Gutter (5,200 In/ft) <br /> Bituminous Paving (85,225 sq/ft) <br /> <br />Bali fields <br /> <br />Baseball (two) <br />-fence + backstops $ 8,300 <br />-ag lime $3,500 <br />-bench and bases $1,900 <br />-infield sod $ 800 <br />-irrigation $10,000 <br />-ouffield seeding $3,300 <br />-light grading $1,000 <br />sub-total x 2 $56,000 <br /> <br />Multi-Purpose (one) <br />-fence + backstops $6,100 <br />-ag time $2,500 <br />-bench and base $1,900 <br />-infield sod $600 <br />-irrigation $8,000 <br />-outfield seeding $3,300 <br />-light grading $1,000 <br />sub total x 2 $46,800 <br /> <br />Ballfield total <br /> <br />Trails <br /> <br />Bituminous Trail (1,200 ln/ft) <br />Gravel trails (10,000 ln/ft to <br />be potentially pavel later <br /> <br />Total Phase One Costs <br /> <br />$ 52,000.00 <br />$ 76,700.00 <br /> <br />$102,800.00 <br /> <br />$10,800.00 <br />$18,000.00 <br /> <br />I <br />I <br />I <br />I! <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.