Laserfiche WebLink
Introduction to Part III Other Projects <br /> <br />The category "Other Projects" includes two lists. The first list has a year of "2010" <br />assigned to it. These projects have either been requested by the municipality in <br />which the road segment is found, or was included in a previous letter of commitment <br />to the Metropolitan Council for reconstruction prior to 2010. This list consists of <br />$52,010,262. in Engineer's Estimate and cannot be funded prior to 2010 with current <br />funding levels. The second part of the listing of "Other Projects" are projects which <br />have been designated by the year "OTHR" and have been identified as projects <br />needing reconstruction for ca.p. acity or safety reasons. These projects total <br />$65,842,825. These routes will hkely require preservation maintenance prior to the <br />time when reconstruction dollars will be available for them. <br /> <br />- 30 - <br /> <br /> <br />