My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/08/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 07/08/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:17:23 PM
Creation date
9/22/2003 10:04:17 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/08/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Subd. 2. When an Excavation Permit is requested for purposes of installing additional <br />Equipment, and a Performance and Restoration Bond which is in existence is insufficient with <br />respect to the additional Equipment in the sole determination of the City., the Permit applicant <br />may be required by the City to post an additional Performance and Restoration Bond in <br />accordance with Section 1.04, Subd. I. <br /> <br />Sec. 1.11. Issuance of Permit; Conditions. <br /> <br />Subd. 1. If the City determines that the Applicant has satisfied the requirements of this <br />chapter, the City may issue a Permit. <br /> <br />Subd. 2. The City may impose any reasonable conditions upon the issuance of a Permit and <br />the performance of the applicant thereunder in order to protect the public health, safety, and <br />welfare, to ensure the structural integrity of the Right-of-Way, to protect the property and safety. <br />of other users of the Right-of-Way, to minimize the disruption and inconvenience to the traveling <br />public, and to otherwise efficiently manage use of the Right-of-Way. <br /> <br />Sec. 1.12. Permit Fees. <br /> <br />Subd. 1. l~xcavation Permit Fee. The Excavation Permit Fee shall be established by the <br />City in an mount sufficient to recover the following costs: <br /> <br />(1) the City Cost; <br /> <br />(2) the Degradation of the Right-of-Way that will result from the Excavation; <br /> <br />(3) Restoration, if done or caused to be done by the City. <br /> <br />Subd. 2. Obstruction P. ermit Fee. The Obstruction Permit Fee shall be established by the <br />City and shall be in an mount sufficient to recover the City Cost. <br /> <br />Subd. 3. Disruptign Fees.. The City may establish and impose a disruption fee as a penalty.- <br />for unreasonable delays in Excavations, Obstructions, or Restoration. <br /> <br />Subd. 4. paymeat of Permit Fees. No Excavation Permit or Obstruction Permit shall be <br />issued without payment of all fees required prior to the issuance of such a Permit unless the <br />Applicant shall agree (in a manner, amount, and substance acceptable to the City) to pay such <br />fees within thirty (30) days of billing therefor. Ail Permit fees shall be doubled during a <br />probationary, period. Permit fees that were paid for a Permit which was revoked for a breach are <br />not refundable. Any refunded Permit Fees shall be less all City Cost up to and including the date <br />of refund. <br /> <br />11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.