Laserfiche WebLink
I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Soo <br /> <br />3 <br /> <br />4 <br /> <br />5 <br /> <br />6 <br /> <br />7 <br /> <br />Item <br /> <br />Mobilization, transporting equipment <br />and material to project area, setting <br />up equipment, demobilization <br />and miscellaneous costs <br /> <br />Drill open hole for 4 inch casing <br />collect samples and note formations <br />Place 4 inch casing in open hole <br />Place neat cement grout between open <br />hole and 4 inch casing <br /> <br />Drill 4 inch open hole, collect samples <br />and note formations <br /> <br />Airlift test hole to clean <br /> <br />Gamma log test hole <br /> <br />Extra Work <br /> <br />Water Analysis <br /> <br />Total Work Completed To Date <br /> <br />1:~38",,43802'¢,3802A\R EQU EST.WB2 <br /> <br />Unit <br /> <br />LS <br /> <br />LF <br /> <br />LF <br /> <br />BG <br /> <br />LF <br /> <br />HR <br /> <br />LS <br /> <br />LS <br /> <br />Contract <br />Quantity <br /> <br />220 <br /> <br />220 <br /> <br />60 <br /> <br />150 <br /> <br /> 2 <br /> <br /> 1 <br /> <br /> Unit <br />Price <br /> <br />600.00 <br /> <br />10.00 <br /> <br /> 6.00 <br /> <br />12.00 <br /> <br /> 6.00 <br />200.00 <br />700.00 <br /> <br />40.00 <br /> <br />Quantity <br /> to Date <br /> <br />142 <br /> <br />145 <br /> <br />60 <br /> <br />208 <br /> <br /> 2 <br /> <br /> 1 <br /> <br />Amount <br />to Date <br /> <br />600.00 <br /> <br />1,420.00 <br /> <br /> 870.00 <br /> <br />720.00 <br /> <br />1,248.00 <br /> 400.00 <br /> 700.00 <br /> <br />40.00 <br /> <br />$5,998.00 <br /> <br /> <br />