My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 08/12/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:18:59 PM
Creation date
9/22/2003 10:34:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/11/97 14:18 FAX 612 441 5665 JOHN OLIVER ASSO ~003 <br /> <br />Page 2 <br />August 1 l, 1997 <br />Mr. Steven J. Jankowski, P.E. <br /> <br /> Technical Services <br /> · Field survey road cross-sections. <br /> · Field work for plat boundary description and plat monumentation. <br /> · Provide construction staking. <br /> · Project construction inspection. <br /> · Preparation of as-built plans. <br /> · Order, coordinate, locate and review soil borings. <br /> Estimated Total Technical Services <br /> <br /> · Provide soil borings, material sampling and testing, <br /> quality control testing and density testing on materials <br /> (not requested in RFP, we will use STS for these services). <br /> <br />The "Technical Services" are proposed to be provided on an hourly basis. <br /> <br />Budgeted Cost <br /> <br />$ 1,300.00 <br /> 2,400.00 <br /> 7,000.00 <br /> <br /> 11,000.00 <br /> <br /> 1,000.00 <br /> <br /> 1,000.00 <br />$23,700.00 <br /> <br /> $3,000.00 <br /> <br />We anticipate STS <br /> <br />will bill the City directly. The budgeted fee for construction staking assumes each necessary <br />item in the project will be staked for construction only one time. I have included our hourly <br />rate schedule for reference. The people who will be involved in the project are currently <br />working on the Street and Storm Sewer Improvements for Project 97-20. Resumes can be <br />submitted, if requested. <br /> <br />I understand the project is on a short schedule. I have two projects that have not proceeded as <br />anticipated, and therefore, technicians and myself are currently available. <br /> <br />Following our selection, we are able to enter into a contract with the City of Ramsey, and to <br />start work immediately. If you have any questions regarding our proposal please feel free to <br />give me a call. <br /> <br />Sincerely, <br /> <br />n ect Manager <br /> losure <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.