My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/09/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 09/09/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:21:06 PM
Creation date
9/22/2003 12:13:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/09/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTING GROUP, INC. <br /> <br />Transportation · Civil · Structural · Environmental, Planning · Traffic · Landscape Architecture · Parking <br /> <br />April 11, 1997 <br /> <br />Mr. Steven Jankowski, P.E. <br />City Engineer <br />CITY OF RAMSEY <br />15153 Nowthen Boulevard <br />Ramsey, Minnesota 55303 <br /> <br />:7;, <br /> <br />Dear Mr. Jankowski: <br /> <br />SUBJECT: <br /> <br />PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES <br />TRUNK HIGHWAY 47, FROM NORTH OF COUNTY ROAD 116 TO <br />NORTH OF COUNTY ROAD 5 <br /> <br />We are pleased to submit this proposal that is based on your request for Professional Engineering <br />Services for improvements to TH 47 from north of County Road 116 to north of County Road 5. The <br />work program outlined herein includes all tasks necessary to complete the City Project (south half of <br />the improvement) and the Local Initiative Project (north half of the improvement). <br /> <br />As we understand it, the project would consist of three phases. The first phase would include <br />development and staff approval of a Mn/DOT layout. This work would include obtaining base <br />information, performing preliminary design, and coordination with Mn/DOT to receive State approval. <br />We have also included preparation of a Project Memorandum in the Scope of Services. This work may <br />not be necessary, but this determination has not been made by Mn/DOT at this time. If the Project <br />Memorandum is not required, we will not charge those hours in our contract. <br /> <br />The second phase would consist of preparation of final plans, specifications and engineer's estimate. <br />The third phase would include assistance in obtaining bids from contractors and construction staking <br />and observation. <br /> <br />Scope of S_ervices <br /> <br />Phase I -- Preliminary Design <br /> <br />1. Surveys and Mapping <br /> <br /> · <br /> <br /> · <br /> <br />160 Hours <br /> <br />Conduct horizontal and vertical control surveys. <br />Obtain right-of-way basemap from the County. <br /> <br />Locate soil borings (geotechn/cal investigation by others). <br />Perform topographic field survey as necessary to prepare planimetric basemap. <br />Prepare planimetric basemap, including all underground utilities, physical features and <br />drawing structures. <br /> <br />One Carlson Parkway North, Suite 150, Minneapolis, MN 55447-4443 <br /> Telephone (612) 475-0010 · Fax (612) 475-2429 <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />[ 0~ An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.