Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />32 <br /> <br />1 <br /> <br />Part 2 - Pumphouse <br />Construct pumping faoility for Well No. 3 <br />including masoary structure, interior piping, <br />well pump, chemical f~ed equipment, <br />electrical controls, meehanicai equipment <br />and correlated appurtenances <br />Total Part 2 - Pumphouse <br /> <br />Breakdown of Part 2 - Pump lqouse <br /> <br />LS <br /> <br />1 208,000.00 99.28% 208,000.00 <br /> <br />Estimated Amount Amount <br /> <br /> Amount 12~is Estimate Previously <br /> <br /> Bonding and insurance <br /> Moblization and gc's <br /> <br /> Excavation and backfill <br /> <br /> Concrete work <br /> <br /> Precast concrete <br /> <br /> Masonry <br /> <br />Metal fabrications <br /> <br />Rough carpentry <br /> <br />Insulation <br /> <br />Wood shingles <br /> <br />Roofing and sheet metal <br /> <br />Roof hatch <br /> <br />Caulking <br /> <br />Metal doors, frames and hardware <br />Plastic doors <br /> <br />Metal windows <br /> <br />Painting <br /> <br />Signs <br /> <br />Well pump <br /> <br />Chemical feed equipment <br /> <br />Process piping and valves <br />Plumbing <br /> <br />Fire protection <br /> <br />H.V.A.C. <br /> <br />Electrical <br /> <br />Total - Break down of Part 2 <br /> <br />6,600 6,600 <br />15,800 2,493.00 13,307 <br />4,200 4,200 <br />8,300 8,300 <br />5,400 5,400 <br />28,900 28,900 <br />900 900 <br />4,100 4,100 <br />1,800 1,800 <br />1,200 1,200 <br />4,200 4,200 <br />1,700 1,700 <br />600 600 <br />3,500 3,500 <br />1,200 1,200 <br />900 900 <br />3,700 3,700.00 0 <br />1,I00 482.00 618 <br />20,700 20,700 <br />14,200 800.00 13,400 <br />I 1,900 I 1,900 <br />3,900 3,900 <br />1,500 1,500 <br />6,100 530.00 5,510 <br />55,600 3,120.00 52,480 <br /> <br />Change Order No. 1 <br /> <br />Modify interior plumbing and relocate drain <br />manhole to the East side of building to obtain <br />50' separation from the well casing to the <br />drain manhole. <br /> <br />2 Form and pour concrete pad for transformer. <br /> <br />1:",438\43803~q EQ UEST6.WB2 <br /> <br /> 208,000.00 <br />Amount <br />To Date <br /> <br />6,600.00 <br />15,800.00 <br />4,200.00 <br />8,300.00 <br />5,400.00 <br />28,900.00 <br />900.00 <br />4,100.00 <br />1,800.00 <br />1,200.00 <br />4,200.00 <br />! ,700.00 <br /> <br /> 600.00 <br /> 3,500.00 <br /> 1,200.00 <br /> <br /> 900.00 <br />3,700.00 <br />1,100.00 <br />20,700.00 <br />14,200.00 <br />11,900.00 <br />3,900.00 <br />1,500.00 <br />6,100.00 <br />55,600.00 <br /> <br />$208,000.00 <br /> <br />($220.00) <br /> <br /> <br />