<br />Part 2 - Pumphouse
<br />Construct pumping faoility for Well No. 3
<br />including masoary structure, interior piping,
<br />well pump, chemical f~ed equipment,
<br />electrical controls, meehanicai equipment
<br />and correlated appurtenances
<br />Total Part 2 - Pumphouse
<br />
<br />Breakdown of Part 2 - Pump lqouse
<br />
<br />LS
<br />
<br />1 208,000.00 99.28% 208,000.00
<br />
<br />Estimated Amount Amount
<br />
<br /> Amount 12~is Estimate Previously
<br />
<br /> Bonding and insurance
<br /> Moblization and gc's
<br />
<br /> Excavation and backfill
<br />
<br /> Concrete work
<br />
<br /> Precast concrete
<br />
<br /> Masonry
<br />
<br />Metal fabrications
<br />
<br />Rough carpentry
<br />
<br />Insulation
<br />
<br />Wood shingles
<br />
<br />Roofing and sheet metal
<br />
<br />Roof hatch
<br />
<br />Caulking
<br />
<br />Metal doors, frames and hardware
<br />Plastic doors
<br />
<br />Metal windows
<br />
<br />Painting
<br />
<br />Signs
<br />
<br />Well pump
<br />
<br />Chemical feed equipment
<br />
<br />Process piping and valves
<br />Plumbing
<br />
<br />Fire protection
<br />
<br />H.V.A.C.
<br />
<br />Electrical
<br />
<br />Total - Break down of Part 2
<br />
<br />6,600 6,600
<br />15,800 2,493.00 13,307
<br />4,200 4,200
<br />8,300 8,300
<br />5,400 5,400
<br />28,900 28,900
<br />900 900
<br />4,100 4,100
<br />1,800 1,800
<br />1,200 1,200
<br />4,200 4,200
<br />1,700 1,700
<br />600 600
<br />3,500 3,500
<br />1,200 1,200
<br />900 900
<br />3,700 3,700.00 0
<br />1,I00 482.00 618
<br />20,700 20,700
<br />14,200 800.00 13,400
<br />I 1,900 I 1,900
<br />3,900 3,900
<br />1,500 1,500
<br />6,100 530.00 5,510
<br />55,600 3,120.00 52,480
<br />
<br />Change Order No. 1
<br />
<br />Modify interior plumbing and relocate drain
<br />manhole to the East side of building to obtain
<br />50' separation from the well casing to the
<br />drain manhole.
<br />
<br />2 Form and pour concrete pad for transformer.
<br />
<br />1:",438\43803~q EQ UEST6.WB2
<br />
<br /> 208,000.00
<br />Amount
<br />To Date
<br />
<br />6,600.00
<br />15,800.00
<br />4,200.00
<br />8,300.00
<br />5,400.00
<br />28,900.00
<br />900.00
<br />4,100.00
<br />1,800.00
<br />1,200.00
<br />4,200.00
<br />! ,700.00
<br />
<br /> 600.00
<br /> 3,500.00
<br /> 1,200.00
<br />
<br /> 900.00
<br />3,700.00
<br />1,100.00
<br />20,700.00
<br />14,200.00
<br />11,900.00
<br />3,900.00
<br />1,500.00
<br />6,100.00
<br />55,600.00
<br />
<br />$208,000.00
<br />
<br />($220.00)