Laserfiche WebLink
I <br />I <br />I <br /> <br />Delete 16" D.I.P., 8'-10'in place <br /> <br />Delete 10" D.I.P., 8'-10' in place <br /> <br />Add 4" P.V.C. drain pipe <br /> <br />f Add Class V aggregate <br /> <br />g Delete Bituminous Base <br /> <br />h Add Bituminous Wear <br /> <br />Delete top soil <br /> <br />Delete site seeding <br /> <br />k Delete silt fence <br /> <br />Total Change Order No, 1 <br /> <br />Total Part I - Site Work <br /> <br />Total Part 2 - Pumphouse <br /> <br />Total Change Order No. 1 <br /> <br />Total Work Completed to Date <br /> <br />Ft. <br /> <br />Ft. <br /> <br />Ft. <br /> <br />Ton <br /> <br />Ton <br /> <br />Ton <br /> <br />CY <br /> <br />Acr~ <br /> <br />Ft. <br /> <br />25 <br /> <br />25.27 <br /> <br />3.38 <br /> <br />4.76 <br /> <br />86 <br /> <br />36.25 <br /> <br />27.00 <br /> <br />I0.00 <br /> <br />19.00 <br /> <br />69.00 <br /> <br />69.00 <br /> <br />16.00 <br /> <br />1,272.00- <br /> <br />($290.00) <br /> <br />($54.00) <br /> <br />$250.00 <br /> <br />$480.13 <br /> <br />($233.22) <br /> <br />$328.44 <br /> <br />($1,376.00) <br /> <br />($2,544.00) <br /> <br />($2,000.OO) <br /> <br />$3,031.80 <br /> <br /> 69,838.00 <br />208,000.00 <br /> <br /> 3,031.80 <br /> <br />$280,869.80 <br /> <br />I:Vk38Vk~803~RF_Q UEST6.Wa2 I~ <br /> <br /> <br />