Laserfiche WebLink
WHEREAS, City Code Section 9.50.50 defines "Stage I" Improvements and <br />"Stage II" Improvements which respective definitions are used herein when reference is <br />made to "Stage I" and "Stage II" Improvements; and <br /> <br /> WHEREAS, the DEVELOPER desires to construct the Stage I and Stage II <br />improvements, except for those Stage II Improvements constructed by the CITY; and <br /> <br /> WHEREAS, no expenditure of CITY funds will be made until the City Code <br />escrow requirements have been completed by the DEVELOPER. <br /> <br />NOW, THEREFORE, the CITY and DEVELOPER agree as follows: <br /> <br />I. STAGE I IMPROVEMENTS AND FINANCIAL GUARANTEES <br /> <br />City Code Compliance. That the DEVELOPER will develop the Plat 'in <br />accordance with the City Code, Section 9.50, entitled Subdivision. <br /> <br />Conformance with Plan. The Plat shall be developed pursuant to the final plat <br />consisting of four (4) sheets, prepared by Passe Engineering, Inc., entitled <br />Regency Pond 3rd Addition. <br /> <br />Incorporation of Ail City Code Requirements. That the recitals above and the <br />provisions of the City Charter, Subdivision Code, Zoning Code and Public <br />Improvement Code of the CITY, as amended to date hereof, are incorporated <br />herein by reference. <br /> <br />Stage I Improvements Required. The DEVELOPER agrees to construct the <br />required Stage I Improvements according to the terms and conditions of this <br />contract and in accordance with DEVELOPERS' plans submitted to the CITY. <br />Said plans shall be in general conformance with the Grading Plan prepared by <br />Passe Engineering, Inc. and dated December 20, 1995. The final Construction <br />plan for sanitary sewer, storm sewer, watermain, and street improvements shall be <br />submitted to tt~e City Engineer for review and approvaI prior to construction. The <br />DEVELOPER shall also be responsible, at its expense, for installation of gas, <br />telephone, and electric utility improvements. Street lights are the responsibility of <br />the DEVELOPER, however, the CITY will arrange for their installation as a <br />Stage JI Improvement. The DEVELOPER shall be responsible for completing <br />the rough grading and providing lot coruer stakes prior to the installation of <br />underground utilities. <br /> <br />Boulevard and Area Restoration. The DEVELOPER shall be responsible for the <br />cost of establishing seed or sod in all boulevards within thirty (30) days of the <br />completion of the street improvements, and restoring all other areas disturbed by <br />the development grading operation in accordance with the approved erosion and <br />sediment control plan. The DEVELOPER shall also be responsible for the cost of <br /> <br /> <br />