My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/25/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 11/25/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:23:07 PM
Creation date
9/23/2003 8:37:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/25/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />'Part <br />3 - Site Work <br />20 <br />Granular borrow <br />' <br />21 <br />22 <br />Class 5 aggregate base <br />Erosion in <br />control fence place <br />23 <br />Seed with mulch <br />' <br />24 <br />Seed with fiber wood blanket <br />25 <br />12" CMP with 2 aprons <br />' <br />Part 3 - Site Work <br />Part 4 - Water Well No. 4 <br />26 <br />Transporting to and erecting on job <br />site all necessary equipment, materials <br />tools <br />and and setting up same <br />27 <br />Drive 30 inch casing including drive shoe <br />' <br />28 <br />Drill 30 inch open hole <br />29 <br />Place 24 inch casing inside casing and <br />open hole <br />30 <br />Furnish and place neat cement grout <br />' <br />between casings and open drill hole <br />31 <br />Dynamite for blasting including labor <br />for shooting, caps and wire <br />' <br />32 <br />Bail <br />33 <br />Furnish, install and remove air compression <br />' <br />equipment for air surging of the well <br />34 <br />Air surging of the well <br />' <br />35 <br />Furnish, install and remove test pump for <br />capacity test of well <br />'36 <br />37 <br />Test pumping <br />Sterilize well, remove all tools and <br />equipment, clean up site and weld on cap <br />Total Part 4 - Water Well No. 4 <br />' <br />Total Part 1 - Water Well Test Drilling <br />Total Part 2 - Water Well No. 3 <br />' <br />Liquidated Damages on Well No. 3 <br />Total Part 3 - Site Work <br />' <br />Total Part 4 - Water WeJI No. 4 <br />Total Work Completed to Date <br />1:\43B\43802\R EQU EST9. W B2 <br />CY <br />680 <br />14.00 800 11,200.00 <br />TN <br />60 <br />10.00 788 7,880.00 <br />LF <br />200 <br />2.50 <br />AC <br />0.7 <br />1,200.00 <br />SY <br />400 <br />3.00 <br />LF <br />50 <br />29.00 25 725.00 <br />19,805.00 <br />LS <br />1 <br />4,000.00 1 4,000.00 <br />LF <br />120 <br />143.00 42 6,006.00 <br />LF <br />180 <br />60.00 <br />LF <br />160 <br />57.00 <br />CY <br />15 <br />225.00 <br />LB <br />200 <br />10.00 <br />CY <br />200 <br />50.00 <br />LS <br />1 <br />2,800.00 <br />HR <br />100 <br />115.00 <br />LS <br />1 <br />1,500.00 <br />HR <br />80 <br />100.00 <br />LS <br />1 <br />1,200.00 <br />10,006.00 <br />15,940.00 <br />93,570.50 <br />(7,400.00) <br />19, 805.00 <br />10,006.00 <br />$131,921.50 <br />11�09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.