My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/25/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 11/25/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:23:07 PM
Creation date
9/23/2003 8:37:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/25/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secvaage disposal *wtenis <br />1. Filter material for a soil treatment unit using gravity <br />distribution of effluent shall not be placed in contact with <br />original soils having a percolation rate faster than 0.1 <br />minute per inch. <br />2. For coarse soils having a percolation rate faster than 0.1 <br />minute per inch, at least 12 inches of loamy sand textured <br />soil having a percolation rate between 6 and 15 minutes per <br />inch at the original site shall be placed between the filter <br />material and the coarse soil along the excavation bottom and <br />sidewalls. The size of the -soil treatment system must be <br />based on the required treatment area for a soil having a <br />percolation rate of 16 to 30 minutes per inch as specified in <br />Table II. <br />3. For soils with percolation rates between 0.1 and 5 minutes <br />per inch, at least one of the following treatment techniques <br />shall be used: <br />a) Distribute the sewage tank effluent by pressure flow over <br />the treatment area as specified in this chapter. <br />b) Divide the total soil treatment area into at least four <br />equal parts connected serially; or <br />c) Provide at least 12 inches of loamy sand textured soil <br />with a percolation rate between 6 and 15 minutes per <br />inch in situ between the drainfield rock and the coarse <br />soils. Trenches must be used with this liner system. <br />The size of the soil treatment system must be based on <br />the required treatment area for a soil having a <br />percolation rate between 16 to 30 minutes per inch as <br />specified in Table II. <br />d. Mounds. <br />Printed 12./26/90 <br />1. Mounds may be constructed on soils having the site or soil <br />conditions specified in §8.30.04 Subd. 7. <br />2. The soil percolation rate in all layers of the natural or fill soil <br />to a depth of at least 24 inches below the sand shall be faster <br />than 120 minutes per inch. <br />3. The allowable absorption area loading rate must be <br />determined according to Table III by the percolation rate of <br />the 12 inches of original or fill soil immediately under the <br />sand layer. <br />Page 255 <br />
The URL can be used to link to this page
Your browser does not support the video tag.