Laserfiche WebLink
Planning Proposal for: <br />MissiSsippi West Regional Park <br /> Anoka County Department of Parks and Recreation <br /> <br />4. DEVELOPMENT CONCEPT <br /> <br /> The map and discussion of the Mississippi West Regional Park are on pages 10-11. <br /> Listed below is the schedule and cost estimate for each portion of the master plan. Please note the <br />schedule of development is affect by the two residents living within the park (see page 16). <br /> <br /> SCHEDULE COST / UNIT TOTAL COST <br /> <br />First Phase ... <br />Frontage Road 2000 l.f. two lane w / no parking <br />Boundary Controls - f~ncing / signage 8000 l.f. plus signage <br />Entry Road 300 1.f. four lane divided <br />Park Road (first phase 9n.concept plan) 4800 l.f. two lane <br />Visitor Contact Station $50,000.00 <br />Trail Head <br />Shelter Building w r~estroorns - water $60,000.00 $60,000.00 <br />Orientation / Information Kiosk $5,000.00 $5,000.00 <br />Bike Lockers 6 units (~z $1000.00 / unit plus base $7000.00 <br />Parking Lot. 30 car capacity $700 per car $21,000.00 <br />Major Park Trail - 10' wi~le I0,000 l.f. (D~ $12.00 per l.f. $120,000.00 <br />Small Boat Access 20 parldng spaces and ramp $40,000.00 <br />Oak - Savanna Restorai/on preparation - planting - maintenance $50,000.00 <br />Extension of Public utilities <br />Water ? <br />Sanitary Sewer ? <br />Electrical ? <br />Storm Water Pond size not established $20,000.00 <br />Assessment of Si~ifie .a:nt Trees $3,000.00 <br />Total <br /> <br />Second Phase <br /> <br />Group Picnic <br />Shelter Buildings (ID. W / restroom (3) (~ $20,000. (1) (D~ $60,000 $120,000.00 <br />Park Road 300 l.f. two lane <br />Parking Lot 100 car capacity (D~ $700. per car $70,000.00 <br />Park Trails 5000 1.f.. ~ $8.00 per I.f. $40,000.00 <br />Fishing Access (1) pier $15,000.00 <br />Oak - Savanna Restoration preparation - planting - maintenance $50,000.00 <br />Total <br /> <br />27 <br /> <br /> <br />