My WebLink
|
Help
|
About
|
Sign Out
Home
05/19/97
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1997
>
05/19/97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:08:43 AM
Creation date
9/23/2003 11:02:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
05/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Jankowski <br />March 21, 1997 <br />Page 2 <br /> <br />5. The radii at TH 47 and CSAH 5 must be increased to 50' to accommodate trucks. <br /> <br />The preliminary layout must be prepared according to the enclosed Tech Memo 91-29~ES-05. This <br />includes roadway dimensions l proper color coding, signal system mast arms, traffic volumes, etc. <br />as outlined in the tech memo. It is assumed at this time that the layout will require a Level II <br />approval. <br /> <br />If you have any questions or require clarification on the layout or the comments, please call either Larry <br />Erb (582-1384) or myself. <br /> <br />Sincerely, ]_ / / <br /> <br />Kevin Hoglund, P.E. <br />Cooperative Agreement Engineer <br />Metro Division <br /> <br />Enclosures: <br /> <br />Tech Memo 91-29-ES-05, Layout Review Process <br />Figure 5-2.04D of the new Mn/DOT Road Design Manual <br />Modified Layout <br /> <br />CC: <br /> <br />Bob Brown, Mn/DOT-Water's Edge <br />Greg Coughlin, Mn/DOT-Water's Edge <br />Sue Mulvihill, Mn/DOT-Oakdale <br />Mukhtar Thakur, Mn/DOT-Water's Edge <br />Dennis Eyler, SRF <br />Project File <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.