Laserfiche WebLink
of years. It is doubtful any contractor would be willing to invest in the purchase of equipment <br />with only the surety of 40 hours of work over the winter period. Nevertheless, finding the right <br />contractor with proper equipment could be an alternative to providing Ramsey with quicker snow <br />removal. <br /> <br />Finally, if it is desired to plow all cul-de-sacs within the four-hour period, it is estimated that the <br />number of cul-de-sac routes would need to be doubled from six (proposed for 1997/1998 season) <br />to twelve. Staff would propose that all the additional routes would be contracted at a cost of <br />$65/hr. for labor and equipment for a total increased cost of $15,600 (6 routes x 4 hrs./route x 10 <br />storms/season x $65/hr.). tn addition to these direct costs, additional Staff time will be required <br />to locate, hire and orient the additional drivers. Also, all drivers, regardless of whether they are <br />temporary City employees or contractors, must take part in the random drug and alcohol <br />sampling program. <br /> <br />Committee Action: <br /> <br />Based on discussion. <br /> <br />Reviewed by: <br />City Engineer <br />Acting City Administrator <br />Finance Officer <br />Fire Chief <br /> <br />RB: 11/18/97 <br /> <br /> <br />