My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/09/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 01/09/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:26:57 PM
Creation date
9/23/2003 11:17:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/09/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br /> <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />i <br /> <br />I <br />I <br />i <br />I <br />I <br /> <br />roadway as the CITY is currently preparing plans for the construction of 0.9 miles of <br />Sunwood Drive including this segment. However, the DEVELOPER agrees to <br />reimburse the CITY for the cost of the improvements along this 600 foot segment of <br />roadway to construct the equivalent section of pavement for a residential street. The <br />DEVELOPER also agrees to pay the cost of installation an eight inch watermain through <br />this section. The actual cost will be determined based upon the unit prices bid and actually <br />installed. An estimate of this cost is Thirty Thousand Dollars ($30,000.00). <br /> <br />Boulevard and Area Restoration. The DEVELOPER shall be responsible for the <br />cost of establishing seed or sod in ail boulevards within thirty (30) days of the completion <br />of the street improvements, and restoring all other areas disturbed by the development <br />grading operation in accordance with the approved erosion and sediment control plan. The <br />DEVELOPER shall also be responsible for the cost of cleaning any soil, earth or debris <br />from the! wetlands within and adjacent to this Plat resulting from grading performed in the <br />development of the land. <br /> <br />Reauirements After Street Surfacing. After the street surfacing is installed, the <br />DEVELOPERS shall clear any soil, earth, or debris from the streets and from the lots <br />within the Plat resulting from any construction on the Subject Property by the <br />DEVELOPER or their successors and assigns. <br /> <br />Stage I Improvements Completion Date. The Improvement completion date shall <br />be on or before June 30, 1996. <br /> <br />Stage Ii Imt~rovement Financial Guarantee. The DEVELOPER agrees and <br />understands that the CITY has the right, privilege and authority pursuant to Minnesota <br />Statutes Chapter 462.358 and as amended as a condition precedent to the approval of the <br />plans and specifications and approval of a final plat, to prescribe requirements and the <br />extent to which, and the manner in which the streets are to be graded or improved, and the <br />installation of sewer and water and other facilities and that the DEVELOPER shall <br />provide a financial guarantee to the cITy to provide for the actual consm~ction and <br />installation of the required Stage I Improvements within a period specified by the City <br />Council. <br /> <br />The DEVELOPER shall provide a financial guarantee to the CITY guaranteeing the <br />construction of the remaining Stage I Improvements and their timely completion. The <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.